BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in Sherbrooke, Quebec. Design plans call for the renovation of a 11,840-square-foot, four-story above grade educational facility.

Renovation of the Divinity House. Renovated spaces will include: Offices for Native Student Counselors at Bishop's University and Champlain College; A meeting place for Aboriginal students; An exhibition hall dedicated to Aboriginal arts; Seminar rooms; An apartment for visitors; Offices of professors; A gathering area outside the building. The Divinity House building is a building built in 1892 as part of Bishop's University's built heritage. This heritage building of the Université anglophone des Cantons de l'Est is located on a site recognized as the traditional ancestral land of the nation Abénaquis. This property is currently closed for reasons of safety and hygiene since 2014 because it presented a risk of collapse. The proposed project to save this building from demolition, is to turn it into a meeting space and resource center for Aboriginal students at Bishop's University as well as Champlain College. The center will be a place for our Aboriginal students to meet, talk and share and to promote cultural and academic learning. The center will also aim to help students succeed and achieve their full academic potential, taking advantage of the many new resources available to them. The center should also promote dialogue and interaction between Aboriginal and non-Aboriginal students at Lennoxville University and Champlain College located on our campus. The project consists of a complete renovation of the 4 floors of the building totaling a little more than 1100 sq m of area. TIMELINE: Contracts for architectural and engineering services to complete design and conduct construction surveillance have been awarded following request for proposals # DIV-2018-0358-025-01. Project is included in the five-year plan of universities for the period of time starting from June 1, 2023, till May31, 2028. Tender and construction timelines will be established accordingly with the owner's internal scheduling. Further update in fall, 2024.

Design

Educational

$4,000,000.00

Public - State/Provincial

Renovation

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
86
Active Projects
37
Bidding Soon
617
All Active Projects
277
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 7, 2025

img_map_placeholder

Rue College, Sherbrooke, QC

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.