Published April 16, 2019 at 8:00 PM

Updated October 1, 2024

Renovation of an educational facility in Plymouth Meeting, Pennsylvania. Completed plans call for the renovation of a 12,800-square-foot educational facility.

Work will be bid as the following Prime Contracts: Contract No. 1 General Construction Contract No. 2 Plumbing Construction Contract No. 3 Mechanical Construction Contract No. 4 Electrical Construction Each Bid must be accompanied by a Certified Check, money order or cashier's good faith check payable to the order of Colonial School District, or Bid Bond in an amount not less than 10 percent (10%) of the total bid, as security. Performance and Payment Bonds are required. Each Bid must be accompanied by a Non-Collusion Affidavit in the form set forth in the Bidding Documents. The right to waive any informality in any Bid, to reject any or all Bids or to award any Contract in the best interest of the Owner is reserved. Bidders on this Work and all subcontractors shall comply with all provisions of the Pennsylvania Prevailing Wage Act. Bidders on this Work and all subcontractors shall comply with all provisions of the Pennsylvania Commonwealth Procurement Code for Prevention of Environmental Pollution.

Award

Educational

$1,432,900.00

Public - County

Renovation

43

17

3

Subscribe For Documents

23 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Allowances, Quantity Allowances, Unit Prices, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Definitions, Quality Control, Temporary Facilities and Controls, Temporary Construction, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cutting and Patching, Cleaning and Waste Management, Final Cleaning, Closeout Procedures, Closeout Submittals, Bonds, Warranties, Project Record Documents, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Selective Structure Demolition
Division 03 - Concrete

Division 03 - Concrete

Concrete Reinforcing, Reinforcing Steel, Cast Decks and Underlayment
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Concrete Unit Masonry
Division 05 - Metals

Division 05 - Metals

Metal Fabrications, Metal Floor Plates
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Sheathing, Underlayment
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Roofing and Siding Panels, Fire and Smoke Protection, Firestopping
Division 08 - Openings

Division 08 - Openings

Doors and Frames, Metal Doors and Frames, Wood Doors, Hardware, Door Hardware, Glazing
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Supports for Plaster and Gypsum Board, Suspension Systems, Gypsum Board, Tiling, Ceramic Tiling, Ceilings, Acoustical Ceilings, Flooring, Wood Flooring, Resilient Flooring, Terrazzo Flooring, Acoustic Treatment, Acoustic Wall Coating, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Visual Display Surfaces, Markerboards, Signage, Interior Specialties, Partitions, Wall and Door Protection, Toilet, Bath, and Laundry Accessories, Storage Specialties, Lockers, Exterior Specialties, Protective Covers, Canopies
Division 11 - Equipment

Division 11 - Equipment

Foodservice Equipment, Educational and Scientific Equipment, Audio-Video Equipment, Entertainment Equipment, Athletic Equipment, Recreational Equipment, Play Field Equipment and Structures, Healthcare Equipment, Therapy Equipment
Division 12 - Furnishings

Division 12 - Furnishings

Casework, Furnishings and Accessories, Rugs and Mats, Runners, Furniture
Division 13 - Special Construction

Division 13 - Special Construction

Special Facility Components, Swimming Pools
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators
Division 21 - Fire Suppression

Division 21 - Fire Suppression

Fire Suppression, Common Work Results for Fire Suppression, General-Duty Valves for Water-Based Fire-Suppression Piping
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, HVAC Air Distribution, HVAC Ducts and Casings, Air Duct Accessories, Dampers, Air Outlets and Inlets
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Common Work Results for Exterior Improvements, Soils for Exterior Improvements, Aggregates for Exterior Improvements
Division 34 - Transportation

Division 34 - Transportation

Transportation

Find More Local Projects

Within 75 Miles of This Project
476
Active Projects
258
Bidding Soon
4,354
All Active Projects
2,047
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 28, 2019

June 17, 2019

img_map_placeholder

230 Flourtown Rd, Plymouth Meeting, PA


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Alterations to Colonial Elementary School

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.