BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, paving and new construction of a mixed-use development in Hill Air Force Base, Utah. Completed plans call for the construction of a military facility; for paving for a road / highway; and for site work for a road / highway.

*Contract Award Date: Dec 30, 2020 Contract Award Number: W9123821C0007 Task/Delivery Order Number: Contractor Awarded Unique Entity ID (DUNS): 831256503 Contractor Awarded Unique Entity ID (SAM): Contractor Awarded Name: POVOLNY GROUP, INC, THE Contractor Awarded Address: Saint Paul, MN USA Base and All Options Value (Total Contract Value): $3892900.00 The design of the East Gate consists of providing a new canopy in the Access Control Zone and Approach Zone. The incoming traffic will require to go through the curved lane unless it is being inspected in the Approach Zone. The Security Forces are going to be able to park their vehicles in the Approach Zone and then walk to the inspection area through a sidewalk. A shelter is also provided in the inspection zone. As vehicles travel through the Response zone, the inbound lane is curved to ensure guards have nine seconds of response time to deploy the active vehicle gates. The passive vehicle barriers, listed in the most recent DoD Anti-RAM list, shall be situated around the perimeter of the East Gate. The outbound lane follows the same curvature as the inbound lane through the Response and Access Control Zones. In the Approach Zone, the outbound lane is minimally impacted. The existing chain-link fence and gate are modified according to the new geometry of the inbound and outbound lanes. The project also consists of providing a generator pad for emergency backup power and providing a connecting point to the existing automatic transfer switch for the critical power systems and existing pop-up vehicle wedge barriers. The uninterruptable power supply is required for many electronic systems and the active vehicle barrier. Other electrical systems needed are an IDS and CCTV infrastructure. And a new advanced meter is required. A new full set of traffic signs for the East Gate and City of Layton are needed. The traffic signs go all the way to the intersection of Fairfield Rd and 6th St. Also, a new set of luminaries with lighting protection shall be constructed for the East Gate and in the City of Layton. The construction of the project will be divided into two phases to allow one lane open at all times. Precise grading that ties into the existing terrain is crucial for the success of the project. The existing infrastructure, such as the asphalt, chain-link fence, booths, and buildings in the Access Control Zone shall be incorporated into the construction. Demolition shall be performed as needed to tie-in the new features to the existing infrastructure. The contractor shall provide all labor, materials, and equipment to construct the East Gate Canopy in the Access Control and Approach Zone in accordance w ith the plans and specifications included within this solicitation. The small business set aside for this project is reserved for Service Disabled Veteran Owned Small Businesses. Per FAR 36.204(f) the magnitude is between $1,000,000 and $5,000,000. The Contractor shall begin performance within 10 calendar days and complete it within 365 calendar days after receiving notice to proceed. Offers providing less than 120 calendar days for Government acceptance after the date offers are due will not be considered and w ill be rejected. Hand-carried offers must be delivered to: The Building Lobby at 1325 J Street, Sacramento, CA. Due to security precautions, offerors may no longer hand-carry their offers directly to Contracting Division. Offers may NOT be turned-in at the Security Desk or left unattended elsewhere in the Lobby. Additionally, you are advised that there is no public parking in the Building. The contract specialist will be in the Building Lobby 20 minutes prior to the closing time to accept hand-carried offers. Offerors who desire to hand-deliver their offers at an earlier time must coordinate with the contract specialist in advance in order to arrange to be met in the Building Lobby by Contracting Division personnel. Please ensure that all courier and delivery personnel are aware of these procedures. *This project timeline has been extended due to the public health crisis.

Award

Military

$3,892,900.00

Public - Federal

New Construction, Paving, Site Work

Subscribe For Documents

23 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
60
Active Projects
33
Bidding Soon
543
All Active Projects
202
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 24, 2020

September 22, 2020

img_map_placeholder

7981 Georgia St, Hill Air Force Base, UT

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.