Demolition, site work, renovation and addition to a water / sewer project in Louisville, Kentucky. Completed plans call for the addition of a water / sewer project; for the demolition of a water / sewer project; for the renovation of a water / sewer project; and for site work for a water / sewer project.
Budget ID No. H14126, Drawing Record No. 15834, Sheet No. 1-206 Hite Creek WQTC Expansion to 9 MGD - Contract Number 15834 The Project will include the installation of new process tanks, buildings, equipment, piping, site improvements, electrical, instrumentation, controls, mechanical and odor control improvements. The project is located at 5512 Hitt Lane, in Northeast Jefferson County, KY. All work shall be done in accordance to MSD's Standard Specifications. The Engineer's Construction Cost Estimate for this project is between $20,000,000 to $24,000,000. The Project Manager for this Invitation to Bid is Tony Harover. All inquiries and questions prior to the bid opening shall be directed, in writing, to MSD's Project Manager Tony Harover at: tony.harover@louisvillemsd.org. Questions received less than 10 days prior to the date for opening of bids may not be answered. Only answers by formal written Addenda will be binding. Oral and other interpretations or clarifications will be without legal effect. All inquiries and questions between the bid opening and the contract awarding shall be directed, in writing, to MSD's Chief Engineer, Angela Akridge, P.E. All bidders shall submit with their bid an acceptable bid bond or a certified check in the amount of seven-and-a-half percent (7.5%) of the bidder's maximum bid price, payable to the Owner. If the Engineer's construction cost estimate is $50,000 or more, the Minority Business Enterprise and Woman Business Enterprise (MBE/WBE) participation goals shall be applicable to all contracts and comply with MSD's Interim Supplier Diversity Policy and Guidelines (Interim Policy). The Interim Policy is considered as one of the elements of responsiveness in a bid. Bidders must subcontract at least 15.0% of the total amount of the Contract Bid price to a certified MBE and 6.0% to a certified WBE, or if the Contractor is unable to meet the goals, must demonstrate adequate "Good Faith Efforts" in accordance with the Interim Policy. Each bidder is responsible for careful review of the Interim Policy requirements contained in the bid documents. Failure to comply with the Interim Policy may be grounds for rejection of the bid as non-responsive. All inquiries and questions prior to the bid opening shall be directed, in writing, to MSD's Project Manager, Tony Harover. MSD Interim Supplier Diversity Policy and Guidelines for this project is as follows: 15% MBE and 6% WBE participation is required for this project. This project is funded with funds provided by the Kentucky Clean Water State Revolving Fund (SRF) with federal funds provided by the Environmental Protection Agency. SRF requirements (including American Iron and Steel and Federal Davis-Bacon Wage Rates) and provisions must be met by the Bidder and all subcontractors. Bidders shall comply with 40 CFR 31.36 which includes but is not limited to the following: (1) the President's Executive Order 11246 (Equal Employment Opportunity) as amended, which prohibits discrimination in employment regarding race, creed, color, sex, or national origin, (2) Title VI of the Civil Rights Act of 1964, (3) the Anti-Kickback Act, and (4) the Contract Work Hours Standards Act. Contractor and its Subcontractors shall comply with 41 CFR 60-4, in regard to affirmative action, to ensure equal opportunity to females and minorities and will apply the timetables and goals set forth in 41 CFR 60-4, if applicable to the area of the Project. Bidder shall make positive efforts to use small, minority, women-owned, and disadvantaged businesses. All bids shall remain subject to acceptance for 90 days after the time set for receiving bids. The Bidder awarded the contract shall complete this project within 660 calendar days. Liquidated damages will be assessed at $500 per calendar day. Local Labor Preference: Yes The contract will be awarded on an evaluated basis to the lowest, responsive, responsible bidder, subject to the approval of the MSD Board. MSD reserves the right to reject any or all bids or waive any informality in any bid. Small and Disadvantaged Business Enterprises are encouraged to bid on this project. MSD is an Equal Opportunity Employer.
Award
Water / Sewer
$23,869,685.00
Public - County
Addition, Demolition, Renovation, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 11, 2019
September 9, 2019
5512 Hite Ln, Louisville, KY
Related To This Project
Louisville, KY
Bid Date: Mar 09 2017
Louisville, KY
--
Veterans Memorial Park: Phase Two Bid Package Four: Parking - Performance Lawn - Sidewalks - 5131785
Louisville, KY
Bid Date: Jul 12 2024
Louisville, KY
Bid Date: May 11 2020
Louisville, KY
--
Louisville, KY
Bid Date: Aug 18 2023
Louisville, KY
Bid Date: Aug 07 2023
Louisville, KY
Bid Date: Jul 31 2023
Louisville, KY
Bid Date: Aug 07 2019
Louisville, KY
Bid Date: Jul 20 2023
Louisville, KY
Bid Date: Aug 15 2023
Louisville, KY
Bid Date: Aug 09 2023
Louisville, KY
Bid Date: Jul 26 2023
Louisville, KY
Bid Date: Aug 03 2023
Louisville, KY
Bid Date: Aug 31 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.