Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of an educational facility in Lexington, Kentucky. Completed plans call for the renovation of a educational facility.
FPAT 255,265 & 267 - Updates to Rooms 255, 265 and 267 (This Project Will Also Replace the Door to Room 263) Include New Lvt Floor, New Ceiling Grid and Tiles, New Lights and Updated HVAC. Upgrade Door Hardware and Emergency Systems. Robotics 323 - This Project Is a Partial Renovation of Room 323. Work Will Include Installing New Acoustic Ceiling Tiles in Existing T-bar Grid, New Led Lighting, New AV Package, Paint and Electrical Improvements. Bids will be received from Prime Contractors on a Lump Sum Amount for the total project. All phases of the work shall be bid to and through the Prime Contractors. Bids shall be submitted in the manner herein described and on the official proposal form included with the conditions and specifications and shall be subject to all the conditions as set forth and described in the Bid Documents. Bids shall be submitted only on the Official Forms supplied by the University of Kentucky, Construction Procurement Section. Failure to comply with the foregoing requirements will be cause for invalidation of bid. Final award of Contract will be made on the basis of the lowest, responsive and responsible bid which offers the best value. The time for substantial completion for all phases shall be August 9, 2019 and Final Completion shall be seven (7) days thereafter. Substantial Completion will include all site restoration completed, site clean-up and fully functional. Bids, upon their receipt by the University of Kentucky, Construction Procurement Section are stamped showing the hour and date received. Bids received after the scheduled closing time for reception of bids will not be considered provided legal and accepted bids have been received on said referenced Invitation. No bidder may withdraw his bid for a period of sixty (60) days after the date set for the opening of bids. Clerical errors and omissions in the computation of the lump sum shall not be cause for withdrawal of the bid without forfeiture of bid bond. Bids may be withdrawn in person only, prior to the closing date for receipt of bids. The University of Kentucky is committed to increasing the participation of minority business enterprises in construction and renovation projects, and encourages the use of minority subcontractors and material suppliers. All contractors should make an effort to locate and use minority business enterprises in bidding this project. For assistance in identifying minority vendors and subcontractors, the contractors may contact: The Kentucky Procurement Assistance Program, 500 Mero Street, 23rd Floor , Frankfort, Kentucky 40601,(800-838-3266) email address CED.kpap@ky.gov,and/or The Office of Business & Occupational Development, Transportation Cabinet, 200 Mero Street, Suite 614, Frankfort, Ky. 40622, (502-564-3601) Attn: Mr. Melvin Bynes, email address Melvin.Bynes2@ky.gov Bidders using minority enterprises as subcontractors and material suppliers are requested to identify these contractors in the space provided on the Form of Proposal. The successful contractor will be asked to supply associated contract amounts rounded to the nearest $500.00 prior to the signing of a contract. The University of Kentucky, Construction Procurement Section, reserves the right to reject any and all bids and to waive all formalities and/or technicalities where the best interest of the University may be served. Anyone wishing to discuss specific items is requested to submit the items in writing to Matthew Spalding Capital Construction Procurement, no later than 04/04/2019 at 1:00pm. Written questions can be submitted by email to: matthew.spalding@uky.edu and sbowlin@uky.edu or fax to 859.257.1951. Note: Responses to Written Questions received no later than 04/04/2019 at 1:00pm will be provided in an addendum. Bidders wishing to submit a request for consideration of an alternate under the provisions of Article 48.3 of the General Conditions to the Contract to any article, device, equipment, product, material, fixture, patented process, form, method or type of construction, or by name, make, trade name, or catalog number shall submit a written request to the University at least 14 calendar days prior to the official bid date of the Project including all necessary information and sufficient detail to allow evaluation by the Consultant and the University and, if the University determines the alternate is acceptable, an addendum will be issued allowing the change and advising all bidders of the option. If no addendum is issued to allow the requested change, the Bidder shall assume the request is not approved and shall prepare the bid on that basis. The apparent low bidder will be requested to meet with the Construction Manager to review the bid and scope of services. The time and place of this meeting will be announced at the bid opening It is therefore a request of each Bidder to include in its bid, 10% for MBE/WBE participation and other requirements as outlined in this section.
Bid Results
Educational
$144,700.00
Public - State/Provincial
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 18, 2019
May 20, 2019
500 S Limestone, Lexington, KY
Related To This Project
Lexington, KY
Bid Date: Apr 23 2020
Lexington, KY
Bid Date: May 12 2020
Lexington, KY
Bid Date: Jul 07 2020
Lexington, KY
Bid Date: Mar 11 2022
Lexington, KY
Bid Date: May 11 2022
Lexington, KY
Bid Date: Nov 23 2021
Lexington, KY
Bid Date: Jun 17 2022
Lexington, KY
Bid Date: Feb 25 2022
Lexington, KY
Bid Date: Dec 08 2020
Lexington, KY
Bid Date: May 01 2020
Lexington, KY
Bid Date: Jan 22 2021
Lexington, KY
Bid Date: Jun 30 2020
Lexington, KY
Bid Date: Nov 05 2020
Lexington, KY
Bid Date: Oct 22 2020
Lexington, KY
Bid Date: Jul 08 2021
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.