BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a municipal facility in Austin, Texas. Completed plans call for the renovation of a municipal facility.

The contract was awarded by the Texas Facilities Commission at their meeting on June 18, 2020. *The previous solicitation is listed below for reference. --- In accordance with the provisions of Texas Government Code, Chapter 2269, Subchapter F, Construction Manager-at-Risk Method, and Rules and Procedures adopted by the Texas Facilities Commission (TFC), TFC is requesting qualifications for a Construction Manager-at-Risk (CMR) to provide estimating and construction services to address deferred maintenance issues identified at the Brown-Heatly Building (BHB) located at 4900 N. Lamar Blvd., Austin Texas, hereinafter described as TFC Project #20-010-5402 (the Project). This Project will be administered by TFC. This procurement will be a two-step award process with a two-part work requirement. CONTRACT TERM: Construction is required to commence within fourteen (14) calendar days after the Notice to Proceed for Construction is issued. For planning purposes, the pre-construction time period is estimated to be One Hundred and Eighty (180) calendar days. The construction contract period is projected for a term of Three Hundred and Sixty Five (365) calendar days except as may be otherwise amended or negotiated. Construction Manager-At-Risk Services to include, but may not be limited to: repairs to HVAC systems, enhancements to indoor air quality, improvements to mechanical, electrical and plumbing systems, replacing roofing systems, exterior cladding/waterproofing repairs, correcting life safety and security deficiencies and correcting architectural deficiencies and finishes. For the consideration of this RFQ, TFC is assessing any known asbestos materials in the existing facility to be abated prior to demolition and construction. Any asbestos abatement of the building is to be considered outside of the construction contract and budget of this RFQ. Any required abatement will be either negotiated with the CMR awarded the contract or addressed by TFC separately

Award

Municipal

$8,783,152.00

Public - State/Provincial

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

7

Subscribe For Documents

20 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
80
Active Projects
44
Bidding Soon
2,370
All Active Projects
811
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.