Renovation of a municipal facility in Champaign, Illinois. Completed plans call for the renovation of a municipal facility.

Work generally includes demolition and replacement of eight residential-type furnaces at the Bresnan Meeting Center. Proposals must be submitted on the forms provided and shall contain no qualifications or interlineations. In submitting a bid, it is agreed that the bid may not be withdrawn for a period of thirty (30) days after Bid Date. A Bid Security in the form of a cashier's check, certified check, or acceptable bidder's surety bond, made payable to the Owner, in an amount that is not less than ten percent (10%) of the Bid proposal submitted shall accompany each Bid. The District reserves the right to reject any or all bids, waive any or all irregularities and select the bid that is in its best interest. All bidders shall comply with the provisions of the Affirmative Action Ordinance of the Champaign Park District, Federal, State, and local laws. All bidders are notified that the Park District will affirmatively assure that the contract will be awarded without discrimination on the grounds of race, color or national origin. All contracts for the construction of Public Works are subject to the Illinois Prevailing Wage Act (820 ILCS 130/1-12). Construction shall commence by May 6, 2019 and be completed by June 7 2019.

Award

Municipal

$124,940.00

Public - City

Renovation

11

14

4

4

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Allowances, Administrative Requirements, Submittal Procedures, Certificates, Shop Drawings, Product Data, and Samples, Quality Requirements, Regulatory Requirements, Quality Assurance, Quality Control, Temporary Facilities and Controls, Temporary Utilities, Temporary Lighting, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cleaning and Waste Management, Closeout Submittals, Project Record Documents, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 08 - Openings

Division 08 - Openings

Louvers and Vents, Vents
Division 09 - Finishes

Division 09 - Finishes

Tiling, Painting and Coating
Division 12 - Furnishings

Division 12 - Furnishings

Furnishings and Accessories, Portable Lamps, Lamps
Division 21 - Fire Suppression

Division 21 - Fire Suppression

Fire Suppression, Common Work Results for Fire Suppression, Meters and Gages for Fire-Suppression Systems, General-Duty Valves for Water-Based Fire-Suppression Piping, Fire Suppression Systems Insulation
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, Meters and Gages for Plumbing Piping, General-Duty Valves for Plumbing Piping, Plumbing Insulation
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Meters and Gages for HVAC Piping, General-Duty Valves for HVAC Piping, HVAC Insulation, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, Air Duct Accessories, Dampers, Turning Vanes, HVAC Fans, Air Outlets and Inlets, Central HVAC Equipment
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Grounding and Bonding for Electrical Systems, Overcurrent Protective Device Coordination Study, Low-Voltage Electrical Distribution, Switchboards and Panelboards, Switchboards, Panelboards, Low-Voltage Circuit Protective Devices, Facility Electrical Power Generating and Storing Equipment, Battery Equipment, Batteries, Lighting
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Detection and Alarm, Fuel-Gas Detection and Alarm, Electronic Monitoring and Control, Electronic Detention Monitoring and Control Systems
Division 31 - Earthwork

Division 31 - Earthwork

Earth Moving, Excavation and Fill, Excavation, Backfill, Compaction
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Lifting Devices, Clamps

Find More Local Projects

Within 75 Miles of This Project
104
Active Projects
57
Bidding Soon
515
All Active Projects
280
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 2, 2019

May 6, 2019

img_map_placeholder

706 Kenwood Rd, Champaign, IL


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Bresnan Meeting Center HVAC Replacement

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.