BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 20, 2019 at 8:00 PM

Updated September 15, 2023

Site work for a bridge / tunnel in Parksville, British Columbia. Completed plans call for site work for a bridge / tunnel.

The project involves replacement of the existing Craig Creek culverts at Northwest Bay with a new culvert, and associated instream works. The Work includes: trench excavation and removal of the existing culverts; installation of a new 4,500 mm diameter corrugated aluminum culvert, including backfilling and installation of slope riprap; repair and replacement of existing utilities; and instream work including construction of new creek alignment channels and installation of LWD.

Award

Bridges / Tunnels

$469,523.00

Public - City

Site Work

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
166
Active Projects
52
Bidding Soon
2,140
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.