BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Milford, Iowa. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; water / sewer project; and water / sewer project.

Work generally consists of approximately: 75.7 UNITS of Clearing and Grubbing; 514 CY of Topsoil, On-Site; 1,314 CY of Excavation, Class 10; 4,793 SY of Subgrade Preparation, 12"; 1,841 SY of 2" Modified Subbase; 4,798 SY of 6" Modified Subbase; 6 EA of Remove and Relocate Signs; 1,003 LF of Sanitary Sewer Gravity Main, Trenched, C900 PVC, 12"; 27 LF of Sanitary Sewer Force Main, Trenched, C900 PVC, 6"; 497 LF of Sanitary Sewer Service Stub, SCH 40 PVC, 4"; 1,031 LF of Removal of Sanitary Sewer; 493 LF of Removal of Sanitary Sewer Service; 20 LF of Storm Sewer, Trenched, 2000D RCP, 12"; 58 LF of Storm Sewer, Trenched, 2000D RCP, 15"; 31 LF of Storm Sewer, Trenched, 2000D RCP, 24"; 1,032 LF of Storm Sewer, Trenched, 2000D RCP, 65"x40" ARCH; 1,202 LF of Removal of Storm Sewer; 2,074 L.F. of Subdrain, Perforated Single Wall HDPE, 6"; 3 EA Manhole, Circular Sanitary Sewer, SW-301; 2 EA Storm Sewer Manholes; 5 EA Storm Sewer Intakes; 9 EA Removal of Existing Manholes and Intakes; 126 SY of Pavement, PCC, 6"; 4,318 SY of Pavement, PCC, 8"; 1,324 SY of Sidewalk and Driveway Removal; 833 SY of Sidewalk, PCC; 42 SF of Detectable Warnings; 881 SY of Driveway, Paved, PCC, 6"; 4,424 SY of Pavement Removal; 1 LS of Temporary Traffic Control; 0.7 AC of Conventional Seeding, Seeding, Fertilizing and Hydro-Mulching; 1 LS of Storm Water Pollution Prevention Plan, Management; 520 LF of Silt Fence, Installation and Removal; 240 SY of Stabilized Construction Entrance; 15 EA of Inlet Protection Device, Installation and Maintenance; 48 SF of Modular Block Retaining Wall; 1 LS of Mobilization; 1 LS of Maintenance of Postal Service; 1 LS of Maintenance of Solid Waste Collection; 16 EA of Remove, Salvage and Replace Mailbox; 1 LS of Electrical and Lighting and other related items of work. Division II: Work generally consists of approximately: 1,115 LF of Removal of Known Pipe; 1,150 LF of Water Main, Trenched, D.I.P., 10"; 55 LF of Water Main, Trenched, D.I.P., 4"; 11 EA Fittings; 21 EA Water Service Stub, Type K Soft Copper; 21 EA Water Service Corporation and Curb Stop and Box; 6 EA Gate Valves; 3 EA Tapping Valve Assemblies; 3 EA Fire Hydrant Assemblies and other related items of work. Division III: Work generally consists of approximately: 142 CY of Excavation, Class 10; 156 LF of Storm Sewer Trenched, 6"; 3 EA Storm Sewer Intakes; 1,833 SF Engineering Fabric; 1,970 SF of Conventional Seeding, Seeding, Fertilizing and Hydro-Mulching; 27 SQ Sod; 1 LS Plants; 390 LF of Silt Fence, Installation and Removal; 33 CY Storage Aggregate; 47 CY Soil Matrix; 6 EA PCC Flume and other related items of work. See Bid Form for exact quantities. Owner: City of Milford

Award

Water / Sewer

$1,418,368.00

Public - City

Paving, Site Work

Subscribe For Documents

34 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
31
Active Projects
16
Bidding Soon
198
All Active Projects
80
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 4, 2019

May 4, 2019

img_map_placeholder

H Ave, Milford, IA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.