BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in Madison, Wisconsin. Completed plans call for the renovation of a educational facility.

In general the work consists of the installation of lake water filtration and hydro optic ultraviolet treatment equipment and expanding the lake water pump house at Helen C. White Hall and the installation of a lake water micro filtration system and ultraviolet treatment equipment and demolition of select water treatment equipment at the Charter Street Heating Plant. Additional work at Helen C. White Hall includes the replacement of a 125 horsepower variable frequency drive with a 250 horsepower variable frequency drive and building wiring and the installation of a manual pull station and a smoke alarm at the lake water pump house and connecting them to an existing fire alarm control panel. Additional work at the Charter Street Heating Plant consists of the replacement of two 700 horsepower reduced voltage soft start units with two 700 hosepower 4kV variable frequency drives and the replacement of four motor control centers with two motor control centers. This project is being let using a new single prime bidding and contracting process. DFD will publicly bid the applicable mechanical, electrical, plumbing, and fire protection (MEP) divisions of work first. Within 5 days of the MEP bid opening, DFD will identify a lowest, qualified, responsible, certified bidder in each applicable MEP division of work. These successful MEP bids must be included in all general prime contractor bids received. No later than 5 days after DFD identifies the successful MEP bids, DFD will publicly open general prime contractor bids. General prime contractor bids that do not include the successful MEP bids will be rejected. The state will enter into a single contract with the lowest, qualified, responsible, certified general prime contractor and this general prime contractor will enter into subcontracts with the successful MEP bidders. Base Bid will be received for A Single lump sum bid for all work Project Locations : 117 Charter Street Madison, Wisconsin & 600 N Park Street madison, Wisconsin. Bid Result HVAC Hooper Corporation - 2,875,000.00 Electrical Van Ert Electric Company, Inc. - 1,414,958.00 Total - $4,289,958

Award

Educational

$4,289,958.00

Public - State/Provincial

Renovation

Subscribe For Documents

35 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
94
Active Projects
49
Bidding Soon
972
All Active Projects
443
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 30, 2019

June 1, 2019

img_map_placeholder

Multiple Locations, Madison, WI

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.