BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 3, 2019 at 8:00 PM

Updated January 26, 2024

Demolition, site work, paving and new construction of a bridge / tunnel in Altura, Minnesota. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

CR 25 Box Culvert REMOVAL OF EXISTING BRIDGE & REPLACEMENT WITH BOX CULVERTS Including Bituminous Surfacing, Clearing and Grubbing, Miscellaneous Removals, RC Box Culverts & Aprons, Random Riprap, Traffic Control, Erosion Control, Turf Establishment and striping. Fairwater Road Box Culvert REMOVAL OF EXISTING BRIDGE & REPLACEMENT WITH BOX CULVERT Including Clearing and Grubbing, Miscellaneous Removals, RC Box Culvert & Aprons, Random Riprap, CS Culvert, Traffic Control, Erosion Control and Turf Establishment. CR 25 Box Culvert Mobilization - 1 LS; Clearing and Grubbing - 1 LS; Sawing Bituminous Pavement (Full Depth) - 66 LF; Remove Bituminous Pavement - 561 SY; 3 CY Shovel - 8 Hours; Dozer - 8 Hours; Aggregate Base Class 2 & Class 2 Modified - 609 TON; Shoulder Base Aggregate Class 2 - 34 TON; Type SP 12.5 Wearing Course Mixture (2,C) - 165 Tons; 16'x5' Precast Concrete Box Culvert - 144 LF; 16'x5' Precast Concrete Box Culvert End Section - 4 Each; Remove Existing Bridge - 1 LS; Structural Excavation Class U (P) - 3,589 CY; Granular Backfill (CV) - 5,433 TON; Course Filter Aggregate (CV) - 523 CY; Random Riprap Class IV - 145 CY; Lean Mix Backfill - 14 CY; Traffic Control - 1 LS; Silt Fence, Type Machine Sliced - 307 LF; Fertilizer Type 3 - 40 Lbs; Erosion Control Blanket, Category 3 - 987 SY; Seed Mixture 25-121 - 15 Lbs; Rapid Stabilization Method 3 - 5 MGal; Seeding - 0.2 Acres; 4" Solid Line Paint - 370 LF and Miscellaneous and Appurtenant Items required for a Complete Project. Fairwater Road Box Culvert Mobilization - 1 LS; Clearing and Grubbing - 1 LS; Unclassified Excavation - 1,136 CY; Aggregate Surfacing Class 2 - 383 TON; Aggregate Base Class 2 Modified - 594 TON; 12'x4' Precast Concrete Box Culvert End Section - 2 Each; 12'x4' Precast Concrete Box Culvert - 36 LF; Remove Existing Bridge - 1 LS; Course Filter Aggregate - 122 CY; Granular Backfill - 721 TON; 21" Span GS Pipe-Arch Apron - 2 Each; 21" Span CS Pipe-Arch Culvert - 30 LF; Random Riprap Class IV - 185 CY; Traffic Control - 1 LS; Silt Fence, Type Machine Sliced - 380 LF; Sediment Control Log Type Wood Fiber - 48 LF; Fertilizer Type 3 - 140 Lbs; Erosion Control Blanket, Category 3N - 2,310 SY; Seeding - 0.4 Acres; Seed Mixture 25-141 - 30 Lbs; and Miscellaneous and Appurtenant Items required for a Complete Project. Solicitation No : 1310, 0460A1014 Location : 1.5 Miles NW OF RoLLINGSTONE, MN on CSAH 25 over Natural Stream, 2.4 Miles NW off the JCT with TH 74 op Fairwater Road, over a Dry Run

Award

Bridges / Tunnels

$534,076.00

Public - County

Demolition, New Construction, Paving, Site Work

43

1

23

7

Subscribe For Documents

34 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
231
Active Projects
128
Bidding Soon
1,859
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 4, 2019

May 6, 2019

Project location map

Fairwater Dr, Altura, MN

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.