BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 20, 2022 at 7:00 PM

Updated November 15, 2023

Site work and paving for a mixed-use development in Juneau, Wisconsin. Completed plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

Dodge County; 1370-02-82; STH 16; 0.148 Miles; Excavation, Base, Concrete Pavement, Asphaltic Surface, Curb and Gutter, Beam Guard, Pavement Marking, Culverts, Bridge Deck Replacement, Wingwall Replacement, and Bridge Painting. The work under this contract shall consist of traffic control, construction access, excavation common, grading, geogrid, select crushed material, base aggregate dense, asphaltic pavement, concrete pavement, curb and gutter, storm sewer, concrete bridge approaches, structure redecking B-14-0041, wingwall replacement B-14-0042, erosion control, seed, erosion mat, riprap, pavement marking and all incidental items necessary to complete the work as shown on the plans and included in the proposal and contract. Estimate Range - $750,000 - $999,999 With each sealed proposal, the bidder must include a properly executed bid bond or a cashiers check, certified check, bank's check, or postal money order in the amount designated on the Highway Work Proposal made payable to the Department. Certified checks shall be drawn on the account of the bidder submitting the proposal. The bidder may also satisfy the proposal guaranty requirements by having a properly executed annual bid bond on file with the Department. Contractors should submit all questions concerning plans and/or proposals through electronically. This process is documented and can be found at Website. Contract Completion Time: 60 Working Days WISDOT - 03 - Watertown - Waukesha, UP RR Structure, B-14-0041 and 42 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. MBE (7.0%), WBE (6.9%), DBE (0%) The Notice to Proceed will be issued no later than July 6, 2022. The contractor shall not start construction operations prior to April 1, 2022.

Award

Bridges / Tunnels

$1,101,951.00

Public - State/Provincial

Paving, Site Work

Subscribe For Documents

19 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
280
Active Projects
156
Bidding Soon
1,401
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.