Site work for a civil project in Chicago, Illinois. Working plans call for site work for a water / sewer project.
As of 5/12/2021, project has been rejected. Work consisting of furnishing all materials, labor, and equipment required for installation of concrete tunnel plugs at the east and west ends of a section of the Thorn Creek Diversion Tunnel (Diversion Tunnel); installation of mass concrete fill east of the east tunnel plug; tunnel lining and contact grouting in the Diversion Tunnel from approximately Station 135+86.40 to Station 136+33 (Contract 77-235-BF stationing); removal of the rock plug in the upper Thorn Creek Connection Tunnel (Connection Tunnel); tunnel lining and contact grouting in the Connection Tunnel from approximately Station 2+07 to Station 0+00 (Sta. 135+86.40 in Contract 77-235-BF); and removal of concrete and metal components, loose rock, sediment, and vegetation at the Thornton Transitional Reservoir (TTR) Diversion Tunnel Portal, within the Diversion and Dewatering Tunnels, and within the TTR. Also within the TTR, removal of the existing concrete haul tunnel plug. Work also includes demolition inside the cone valve dewatering chamber, including the removal of four (4) 42 diameter knife gate valves, two (2) 42 cone valves and spool pieces, and the hydraulic power unit and its appurtenances, along with removal of all conduits, cables and other live utilities from the control room (elevation +27.5) to the valve chamber (elevation -252.3); sealing a 42 dewatering pipe with a DIP blind flange and replacing a cone valve with a 42 DIP pipe; The Dewatering Chamber and Valve Shaft shall be sealed shut at the access point in the control building; installation of backflow preventer on the 42 dewatering outlet pipe inside the Construction Shaft; removal of two (2) electrical cabinets along Vincennes Road; removal of existing swing gate at northwest corner of the Thornton Composite Reservoir (TCR) and replacement with new chain link fencing and posts; Repairs to rockfall netting at approximately nine (9) locations along the TCR north highwall access ramp; Removal of rock and sediment debris at the bubbler intake adjacent to toe of TCR north highwall; Installation of reservoir level measurement equipment at the TCR; Work at the 30-ft diameter TCR Construction Shaft includes concrete liner repairs; Work at the TCR Construction Shaft and Gate Shaft includes installation of the 13,500 CFM odor control systems for the Construction and Gate Shafts including carbon filters, in-line fans with 25 HP motors, and associated ductwork between carbon filters and shaft covers; Installation of stainless steel covers, with safety air pressure relief dampers, above the 63-ft diameter gate shaft and the 30-ft diameter construction shaft; Construction of concrete pads for odor control equipment; Furnishing and installing conduit, cable, starters, breakers, etc. and tie-in to the existing electrical distribution system and tie-ins to the existing control architecture for the odor control system; and performance of other work as specified in the Contract Documents and as shown on the Plans. The estimated cost of the work under Contract 15-266-4H4 (Re-Bid), is between $14,598,000.00 and $17,671,000.00. The Project Manager for this contract is Brian Wawczak. The Metropolitan Water Reclamation District of Greater Chicago reserves the right to reject any or all proposals.
Final Planning
Water / Sewer
$26,653,500.00
Public - State/Provincial
Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 13, 2021
November 12, 2021
Multiple Locations, Chicago, IL
Related To This Project
Chicago, IL
Bid Date: Dec 21 2022
Chicago, IL
Bid Date: Dec 20 2022
Chicago, IL
Bid Date: Jan 25 2023
Chicago, IL
--
Chicago, IL
Bid Date: Dec 08 2022
Chicago, IL
Bid Date: Sep 29 2022
Chicago, IL
Bid Date: Dec 15 2022
Chicago, IL
Bid Date: Dec 13 2022
Chicago, IL
Bid Date: Feb 01 2023
Chicago, IL
Bid Date: Dec 06 2022
Chicago, IL
--
Chicago, IL
--
Chicago, IL
Bid Date: Dec 06 2022
Chicago, IL
Bid Date: Nov 29 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.