BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, paving and renovation of a mixed-use development in Orlando, Florida. Completed plans call for site work for a road / highway; for paving for a road / highway; bridge / tunnel; bridge / tunnel; sidewalk / parking lot; for the renovation of a bridge / tunnel; sidewalk / parking lot; and water / sewer project.

Counties: Orange Road Name: SR 435 (Kirkman Rd) Limits: From N of Sr 482 to S of Sr 408, Excluding S of International Dr to N of Major Blvd Project(s): 43734115201(*) Federal Aid No: D517084B Project(s): 43734115202 Federal Aid No: D517084B Project(s): 43734115601 Federal Aid No: N/A Total Roadway Length: 5.470 Miles Contract Days: 650 Total Bridge Length: 0.055 Miles Total Proposal Length: 5.525 Miles Contract Execution Days: 10 Special Start Date: N/A Aquis/Flexible Start Time: 30 Calendar Days The improvements under this contract consist of work to mill and resurface, provide cross slope correction at isolated locations, provide pavement widening at isolated locations, curb ramp and sidewalk upgrades throughout the project corridor, sidewalk removal, shared use path construction, bridge sidewalk removal and construction, pipe desilting, gravity wall construction, restoration of spalled areas on bridge culvert, drainage pipe and structures, pedestrian signal upgrades, signing and pavement markings, traffic monitoring sites, signalization, ITS along SR 435 (Kirkman Rd.) and goes-with project for the City of Orlando Reclaimed Water/ Wastewater Utility Work by Highway Contractor (UWHC). For bids over $150,000.00, the standard proposal guaranty of 5% of the bid will be required, unless otherwise stipulated in the proposal advertisement. A Proposal Guaranty of not less than five percent (5%) of the total actual bid in the form of either a certified check, cashier's check, trust company treasurer's check, bank draft of any national or state bank, or a Surety Proposal Guaranty made payable to the Florida Department of Transportation must be received for each bid in excess of $150,000.00. A 100% Payment and Performance Bond will be required for all projects unless noted otherwise in the project specifications. All work is to be done in accordance with the Plans, special Provisions of the State of Florida Department of Transportation. FDOT - Call Order: 016 - Resurfacing

Award

Bridges / Tunnels

$16,216,216.00

Public - State/Provincial

Paving, Renovation, Site Work

737

5

4

7

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
164
Active Projects
99
Bidding Soon
1,465
All Active Projects
573
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 22, 2019

May 31, 2019

img_map_placeholder

FL-435, Orlando, FL


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.