BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and new construction of a water / sewer project in Littleton, Massachusetts. Completed plans call for the construction of a 10,500-square-foot water / sewer project; and for site work for a water / sewer project.

Request for Qualifications - RFQ - Contractor 01/21/2021 at 2:00 PM ET From: Littleton Electric Light and Water Departments, Owner - Prequalification will be received at the office of the Littleton Water Department, 39 Ayer Road, Littleton, Massachusetts 01460 at which time all SOQs will be privately opened. The Statement of Qualifications will not be opened publicly. De **General Bid Deadline: Jan 21, 2021 at 2:00 PM No site visit will be scheduled. Treatment plant site is open for visits. This Request for Qualifications (RFQ) is the first step of a two-phase bidding process as required by M.G.L. Chapter 149, Section 44D 1/2 and Section 44D 3/4 for building contracts estimated to cost $10 million or more. The estimated construction cost of the project is $15.9M. The Littleton Water Department's Prequalification Committee will consist of representatives from the Water Department and the project's consulting engineering firm of Tighe & Bond. The committee will evaluate the Statement of Qualifications using the criteria contained in the RFQ and prequalify those General Contractors and Subcontractors meeting a minimum RFQ criterion score. Following prequalification, the Littleton Water Department will invite the prequalified respondents to submit General Bids and Filed Sub-Bids for the Whitcomb Avenue Water Treatment Plant Project. General Bidders must be DCAMM certified in 'Sewage and Water Treatment Plants'. Filed Sub- Bidders must be DCAMM certified for the category of work for which they are submitting a bid. The work consists of construction of a new 1.8 MGD water treatment plant within a 10,500 s.f. masonry building that will contain filtration equipment, process piping, below grade storage tanks, and chemical feed systems. The treatment plant will remove iron, manganese and PFAS from three well sources to produce treated drinking water. The work includes, but is not limited to, excavation and backfill, site utilities, concrete and masonry building construction, process piping, chemical feed systems, HVAC, plumbing, electrical systems, and instrumentation and controls. Construction is expected to begin in May 2021. The project shall be substantially completed within 500 calendar days following the Notice to Proceed. The successful respondent must be able to obtain bonding for the full construction cost. Disadvantage Business Enterprise (DBE) goals may be applicable on this project. The minimum goals for this project are 4.2% D/MBE participation and 4.5% D/WBE participation by certified DBE firms. Further public notice information regarding the specifics of this project and the prequalification evaluation criteria and selection process is included in the RFQ. The work consists of construction of a 10,500 s.f. single story masonry building that will contain filtration equipment, process piping, below grade storage tanks, pumping equipment, electrical and chemical feed systems. The project also includes demolition and upgrades to Well No.1 Pump Station, upgrades to Well No.5 Pump Station and all related site work. The project shall be completed within the Contract Time identified in the Agreement Construction of a new 1.8 MGD water treatment plant that will remove iron, manganese, and PFAS from three well sources in order to produce drinking water that meets the latest drinking water standards. The work consists of construction of a 10,500 s.f. single story masonry building that will contain filtration equipment, process piping, below grade storage tanks, pumping equipment, electrical and chemical feed systems. The project also includes demolition and upgrades to Well No.1 Pump Station, upgrades to Well No.5 Pump Station and all related site work.

Under Construction

Water / Sewer

$15,764,889.00

Public - City

New Construction, Site Work

152

1

14

9

Subscribe For Documents

138 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
322
Active Projects
169
Bidding Soon
3,006
All Active Projects
1,253
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 15, 2021

June 16, 2021

img_map_placeholder

76 Whitcomb Ave, Littleton, MA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.