Published April 16, 2019 at 8:00 PM

Updated October 1, 2024

Site work, new construction and renovation of a mixed-use development in Milwaukie, Oregon. Working plans call for the construction of a educational facility.

Build out of new Main Distribution Frame (MDF) Room at Lower level which involves demolition of existing walls, removal, salvage and re-use of selected doors, installation of new MDF racks which will accommodate MDF equipment (supplied and installed by owner), and wall mounted HVAC split system. Build out of new workroom and secure storeroom at lower level which involves new custom casework and fixture to walls of new free-standing shelving (supplied by owner). Replace existing double exterior door with new double door with removable center mullion. Removal of selected lower level door, associated wall and subsequent repair of affected wall surface. Buildout of new kitchen at upper level which involves new flooring surface, new upper and lower custom casework, new sink, salvage and re-use of selected fixtures. Replace wall mounted drinking fountain. Removal and disposal of selected wall mounted items throughout, patch and paint at selected locations throughout, repair of damaged resilient wall base throughout. Installation of new emergency power generator, emergency electrical panel and Automatic Transfer Switch to service new MDF Room and selected existing circuits. Exterior work includes: Paint south side exterior wall to match existing, Generator pad, generator installation and access to service generator, Heat Pump pad and installation of Heat Pump. Access controls and security are by others. Alternates include: Removal of wall at kitchen and ceiling replacement Liquidated Damages as detailed in Section 004000 will apply to the resulting Contract. Architects Estimate for the total of this project is $150,000 (not including alternates). Protests, Technical Questions, Requests for Clarification or Changes of Specifications and/or Bidding Requirements, including Substitution Requests, must be received by the purchasing specialist in writing no later than seven (7) calendar days prior to bid closing date and time. Bidders shall comply with all BOLI and CCB requirements as adopted in Senate Bill 477 (effective January 1, 2006) including all filing, notification, and payment requirements; retainage for payment for labor, and the filing of a $30,000 public works bond with the Oregon Construction Contractors Board. The Public Works Bond shall be obtained from a corporate surety authorized to do business in this state.

Final Planning

Educational

$150,000.00

Public - County

New Construction, Renovation, Site Work

25

23

2

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Payment Procedures, Schedule of Values, Quality Requirements, Regulatory Requirements, Quality Assurance, Quality Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Closeout Procedures, Closeout Submittals, Maintenance Data, Bonds, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Concrete Unit Masonry
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework, Plastic Fabrications
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Fire and Smoke Protection, Firestopping
Division 08 - Openings

Division 08 - Openings

Doors and Frames, Metal Doors and Frames, Wood Doors, Hardware, Door Hardware
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Supports for Plaster and Gypsum Board, Suspension Systems, Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Painting and Coating, Painting
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage
Division 12 - Furnishings

Division 12 - Furnishings

Casework, Furniture
Division 21 - Fire Suppression

Division 21 - Fire Suppression

Fire Suppression, Common Work Results for Fire Suppression, Hangers and Supports for Fire-Suppression Piping and Equipment, Fire Suppression Systems Insulation
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, Hangers and Supports for Plumbing Piping and Equipment, Plumbing Insulation
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Hangers and Supports for HVAC Piping and Equipment, HVAC Insulation, Instrumentation and Control for HVAC, Pneumatic and Electric Control System for HVAC, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, HVAC Fans, Air Outlets and Inlets, HVAC Air Cleaning Devices, Central HVAC Equipment, Decentralized HVAC Equipment, Decentralized Unitary HVAC Equipment, Split-System Air-Conditioners
Division 25 - Integrated Automation

Division 25 - Integrated Automation

Integrated Automation Facility Controls, Integrated Automation Control of Electrical Systems
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Low-Voltage Electrical Power Conductors and Cables, Hangers and Supports for Electrical Systems, Low-Voltage Electrical Distribution, Low-Voltage Switchgear, Switchboards and Panelboards, Panelboards, Low-Voltage Circuit Protective Devices, Fuses, Lighting, Interior Lighting
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Detection and Alarm, Fuel-Gas Detection and Alarm
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Earth Moving, Excavation and Fill, Trenching, Backfill, Erosion and Sedimentation Controls
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Common Work Results for Exterior Improvements, Soils for Exterior Improvements, Aggregates for Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs and Gutters, Paving Specialties, Pavement Markings, Planting, Planting Preparation, Soil Preparation, Plants, Shrubs, Trees
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment

Find More Local Projects

Within 75 Miles of This Project
61
Active Projects
39
Bidding Soon
564
All Active Projects
264
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 15, 2019

April 30, 2019

img_map_placeholder

4444 SE Lake Rd, Milwaukie, OR

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Technology and Information Services Building Renovation

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.