BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 24, 2019 at 8:00 PM

Updated March 4, 2026

Site work, paving and new construction of a bridge / tunnel in Salluit, Quebec. Completed plans call for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

Reference Number : 1251225 Bid transmitted electronically accepted: No Expected duration of the contract (in months): Less than a year Duration: 105 days Performance bond and obligation bond for wages, materials and services of each corresponding 50% is required. Société de développement de la Baie-James (the Corporation) wishes to receive offers for the designated tender. It should be noted that the granting of this contract is conditional on obtaining all the authorizations required for the execution of the work. Service Providers must submit their bid in a sealed envelope bearing the following entries: His name and address; The name and address of the recipient, either to Mrs. Chantal Brassard at the address mentioned below; The mention "Soumission"; The title and number of the project, "Construction d'une structure en arche au km 19,8 du chemin de LA-1 - Appel d'offres SD19-5015-1 ". A bid bond guarantee representing 10% of the total bid amount including taxes must accompany the bid. The Company does not undertake to accept any of the tenders received, in particular when it considers that the prices are too high or disproportionate or do not reflect a fair price. The Company is not obliged to justify the acceptance or rejection of any offer. Important Notice It is strongly suggested that the service provider apply for an attestation from Revenu Québec as quickly as possible in order to be able to resolve any problem relating to obtaining it before the deadline and date set for receiving submissions. Indeed, section 2.7 of the Instructions to Service Providers, which requires the attestation of Revenu Québec to be held by service providers, provides that the certificate is valid until the end of the three-month period. follows the month in which it was issued. In addition, the certificate must not have been issued after the date and time set for the receipt of tenders.

Award

Bridges / Tunnels

$2,159,477.00

Public - State/Provincial

New Construction, Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
2
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 17, 2019

May 17, 2019

Project location map

To Be Determined, Salluit, QC

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.