Site work for a mixed-use development in Cottage Grove, Minnesota. Completed plans call for site work for a playground / park / athletic field; and water / sewer project.

As of 05/07/2019 The Hamlet Park Project was awarded to Miller Excavating Inc, in the amount of $284,063.95. A project schedule and start date has not been submitted yet for the project. In general, Work consists of the following approximate quantities: 1 EA Sanitary Sewer Structure 60 LF PVC Sanitary Sewer Pipe 850 LF HDPE Sanitary Sewer Pipe 610 LF DIP Watermain 400 CY Rock Excavation 6,300 CY Common Excavation 7,120 CY Screen Stockpiled Topsoil 10,850 CY Place Stockpiled Material 2,600 CY Haul Material Offsite 15 TN Bituminous Mixtures 1,900 LF Silt Fence 12 AC Turf Restoration Together with numerous related items of work, Bid Security in the amount of 5 percent of the amount of the Bid must accompany each Bid in accordance with the Instructions to Bidders. The Owner reserves the right to retain the deposits of the 3 lowest Bidders for a period not to exceed 60 days after the date and time set for the Opening of Bids. No Bids may be withdrawn for a period of 60 days after the date and time set for the Opening of Bids. The Owner reserves the right to reject any and all Bids, to waive irregularities and informalities therein, and further reserves the right to award the Contract to the best interests of the Owner.

Award

Water / Sewer

$284,064.00

Public - City

Site Work

19

21

6

Subscribe For Documents

36 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Summary of Work, Work by Owner, Price and Payment Procedures, Unit Prices, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Definitions, Quality Assurance, Quality Control, Contractor Quality Control, Temporary Facilities and Controls, Temporary Construction, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures, Temporary Controls, Temporary Erosion and Sediment Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management, Closeout Submittals, Warranties
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Selective Site Demolition
Division 03 - Concrete

Division 03 - Concrete

Cast-in-Place Concrete, Concrete Curing, Precast Concrete
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Joint Protection, Joint Sealants
Division 08 - Openings

Division 08 - Openings

Hardware, Glazing, Glass Glazing
Division 09 - Finishes

Division 09 - Finishes

Tiling, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Storage Specialties, Postal Specialties
Division 12 - Furnishings

Division 12 - Furnishings

Furnishings and Accessories, Bedroom Furnishings, Blankets
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Lifts
Division 21 - Fire Suppression

Division 21 - Fire Suppression

Fire Suppression, Common Work Results for Fire Suppression, General-Duty Valves for Water-Based Fire-Suppression Piping
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Grounding and Bonding for Electrical Systems, Lighting, Exterior Lighting, Roadway Lighting
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Finish Grading, Excavation and Fill, Subgrade Preparation, Excavation, Trenching, Dewatering, Fill, Backfill, Compaction, Embankments, Erosion and Sedimentation Controls
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Mowing, Watering, Common Work Results for Exterior Improvements, Soils for Exterior Improvements, Aggregates for Exterior Improvements, Bases, Ballasts, and Paving, Base Courses, Aggregate Base Courses, Curbs and Gutters, Paving Specialties, Pavement Markings, Planting, Turf and Grasses, Plugging, Seeding, Sodding, Plants, Shrubs, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Lifting Devices, Lifts
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
148
Active Projects
103
Bidding Soon
1,006
All Active Projects
469
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 18, 2019

May 20, 2019

img_map_placeholder

8883 Hamlet Ave S, Cottage Grove, MN


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Hamlet Park Expansion

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.