Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 7, 2019 at 8:00 PM

Updated November 4, 2026

Site work and paving for a road / highway in Sacramento, California. Completed plans call for site work for a road / highway; and for paving for a road / highway.

**As of April 18, 2019, project is under review. The Contractor shall furnish all supervision, labor, materials, equipment, and incidentals necessary to accomplish the work in accordance with the Contract. The work generally consists of asphalt placement, overlay, repair, patching and sealing the other asphalt work as described by SMUD. The work will be performed in various locations though out the Upper American River Project (UARP) in El Dorado County, California. The work consists of individual jobs which will be released as the need arises. Contractors shall anticipate that approximately 20% of the contract value shall be to supply and transport asphalt materials to the job sites. The scope is further described in the Technical Conditions. Prior to commencing work on any activity, SMUD will issue a Task Authorization for each requested Contract activity. The Task Authorization will contain at a minimum the following: o a description of the work to be performed o the estimated cost o time required o any extraordinary project parameters A Task Authorization Letter, prepared by SMUD and signed by both parties' authorized representatives will be the authorization for the Contractor to perform the task. The Contractor shall, within three working days of receipt of any Task Letter, accept or reject it. Any rejection shall be accompanied by a written explanation. The Contractor will provide SMUD with a monthly report that briefly describes the status of all Contract tasks. All invoices billing to a Task will be submitted to SMUD within 90 days of Task closing date. Invoiced costs for any Task that are in excess of the approved Task value will not be reimbursed by SMUD. The Contractor shall provide written notice within seven (7) days to SMUD when task expenditures reach 70 percent of the authorized dollar limit. SMUD intends to award one or more contract(s) to the highest rated Proposers as a result of this solicitation. The work to be performed under the resulting contract(s) shall be in the form of individual Purchase Orders. The aggregate amount of all tasks shall not exceed an amount between $1,200,000 to $2,000,000.

Award

$2,000,000.00

Public - County

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
471
Active Projects
175
Bidding Soon
3,001
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 18, 2019

June 17, 2019

Project location map

Multiple Locations, Sacramento, CA


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed