BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, paving and outdoor lighting for a transportation facility in Ardmore, Oklahoma. Completed plans call for site work for a transportation facility; for outdoor lighting for a transportation facility; and for paving for a transportation facility.

As of May 8, 2019 the project has been awarded for $3,608,247.30. Plans and Specifications are on file and may be examined at the office of the Grant Administrator, 23 South Washington, Ardmore, OK 73401, and at the office of the Consulting Engineers, Lochner, 13439 Broadway Ext., Suite 101, Oklahoma City, OK 73114. All bidders submitting a bid must obtain an electronic copy of bid documents from Lochner to submit a valid bid. Any proposal submitted that was obtained from an outside source other than Lochner will be considered an irregular proposal and will be eligible for rejection. When the bidder purchases a set of bid documents, the bidder will be placed on a plan holder's list, which is necessary to supply bidders with any addenda that may be issued for the project. When orders for a set of bid documents are received, the documents will be transmitted electronically to the bidder.  If the Bidder requests delivery by some other means, the Bidder will be assessed the delivery charge, which is to be paid prior to delivery. Each proposal must be accompanied by a bid guaranty in the amount of five (5) percent of the total amount of the bid.  The bid guaranty may be by certified check or bid bond made payable to the City of Ardmore, Oklahoma. Bids may be held by the City of Ardmore for a period not to exceed ninety (90) calendar days from the date of the bid opening for the purpose of evaluating bids prior to award of contract. The right is reserved, as the City of Ardmore may require, to Invitation to Bid. . . . . . .710 reject any and all bids and to waive any informality in the bids received. This project is subject to the requirements of the Davis-Bacon Act, as amended. The Contractor is required to comply with wage and labor provisions and to pay minimum wages in accordance with the schedule of wage rates established by the United States Department of Labor. This project is subject to the requirements of 49 CFR Part 26 Disadvantaged Business Enterprise Participation. The owner has established a contract goal of 6.0% Race Neutral and 1.1% Race Conscious participation for a total goal of 7.1% for small business concerns owned and controlled by qualified disadvantaged business enterprises (DBE). The bidder shall make and document good faith efforts, as defined in Appendix A of 49 CFR Part 26, to meet the established goal. Award of contract is also subject to the following Federal provisions: Executive Order 11246 and DOL Regulation 41 CFR PART 60 - Affirmative Action to Ensure Equal Employment Opportunity. DOL Regulation 29 CFR Part 5 – Davis Bacon Act. DOT Regulation 49 CFR PART 29 - Governmentwide Debarment and Suspension and Governmentwide Requirements for Drug-free Workplace. DOT Regulation 49 CFR PART 30 - Denial of Public Works Contracts to Suppliers of Goods and Services of Countries that Deny Contracts to Suppliers of Goods and Services of Countries that Deny Procurement Market Access to U.S. Contractors (Foreign Trade Restriction).

Award

Transportation Terminals

$3,608,247.00

Public - City

Outdoor Lighting, Paving, Site Work

76

17

6

4

Subscribe For Documents

22 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
81
Active Projects
45
Bidding Soon
729
All Active Projects
318
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

April 24, 2019

May 24, 2019

December 20, 2019

img_map_placeholder

620 General St, Ardmore, OK

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.