Site work for a playground / park / athletic field in Terryville, Connecticut. Conceptual plans call for site work for a playground / park / athletic field.

Cost Estimate is above $2,000,000. Bids will be received for furnishing all labor, materials, tools, services and equipment necessary to complete the "Renovations for Gosinski Park" , 43 Ronald Road - Gosinski Park, Terryville, CT. The award of this project is dependent on funding by the DOH/Connecticut Housing Finance Authority, and other funding resources. The lowest response of bid will be included as part of the finance application, with expected results in mid-September 2019 or shortly thereafter. The project scope includes: Gut renovations and additions of (5) units to create ADA compliant layouts. Bathroom renovations, kitchen renovations, painting, and flooring overlay at 55 units. Parking lot re-milling and minor expansion. Community building kitchenette expansion, bathroom renovations, and interior finishes upgrades. Community building addition. Hot water tanks and electrical panel replacements. Proposed forms of Contract Documents, including Plans and Specifications dated April 2, 2019, as prepared by Quisenberry Arcari Malik, LLC will be on file at the Gosinski Park Community Room, Terryville, CT and available to contractors for viewing upon request. Note: Addenda to this bid will be issued via email. Contractors intending to bid must be registered on the Advanced Reprographics Planholder's list in order to receive direct email of any and all addenda. No interpretation of the meaning of the plans, specifications or other pre-bid documents will be made to any bidder orally. Every request for such interpretation should be in writing addressed to: Kyle J. White, kwhite@qamarch.com. To be given consideration, RFI's must be received by 5:00pm, Friday, April 12th 2019. Any and all such interpretations and any supplemental instruction will be in the form of written addenda to the specifications which, if issued, will be forwarded by electronic mail to all prospective bidders (at the respective email addresses furnished for such purposes), not later than two days prior to the date fixed for the opening of bids. Attention of bidders is directed to certain requirements of this contract which require payment of prevailing wages, and compliance with certain local and state requirements. All bidders, contractors, and workers are to comply with the specified background checks, are not to be excluded of the OIG Exclusions Database, are to be fully licensed in Connecticut, and are not to be excluded of the CT Debarment List. The successful bidder will be required to furnish and pay for 100% Performance and Payment Bond or Bonds, in the forms included in the Specifications. No bids shall be withdrawn for a period of one hundred and twenty (120) days after the opening of bids, without the consent of the above Housing Authority. The Housing Authority of the Town of Plymouth reserves the right to accept or reject any or all bids; to waive any informality, or; to accept any bid deemed in the best interests of the Housing Authority. An Affirmative Action/ Equal Opportunity Employer, MBE's, WBE's, and SBE's and Section 3 Designated Enterprises are encouraged to apply.

Project Abandoned

Playgrounds / Parks / Athletic Fields

$2,000,000.00

Public - City

Site Work

47

25

10

5

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Allowances, Unit Prices, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Definitions, Quality Assurance, Quality Control, Testing and Inspecting Services, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cutting and Patching, Cleaning and Waste Management, Progress Cleaning, Closeout Submittals, Maintenance Data, Bonds, Warranties, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Welded Wire Fabric Reinforcing, Cast-in-Place Concrete, Structural Concrete
Division 05 - Metals

Division 05 - Metals

Metal Fabrications, Metal Railings, Metal Floor Plates
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Wood, Plastics, and Composites, Common Work Results for Wood, Plastics, and Composites, Rough Carpentry, Sheathing, Finish Carpentry, Millwork, Architectural Woodwork, Wood Stairs and Railings, Plastic Fabrications
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing, Thermal Protection, Steep Slope Roofing, Shingles and Shakes, Asphalt Shingles, Roofing and Siding Panels, Siding, Fire and Smoke Protection, Firestopping
Division 08 - Openings

Division 08 - Openings

Doors and Frames, Metal Doors and Frames, Wood Doors, Windows, Plastic Windows, Hardware, Door Hardware, Window Hardware, Glazing, Glass Glazing, Louvers and Vents, Vents
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Gypsum Board, Tiling, Flooring, Resilient Flooring, Carpeting, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Directories, Interior Specialties, Partitions, Toilet, Bath, and Laundry Accessories
Division 12 - Furnishings

Division 12 - Furnishings

Casework, Countertops, Furnishings and Accessories, Rugs and Mats
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators, Scaffolding
Division 21 - Fire Suppression

Division 21 - Fire Suppression

Fire Suppression, Common Work Results for Fire Suppression, General-Duty Valves for Water-Based Fire-Suppression Piping, Hangers and Supports for Fire-Suppression Piping and Equipment, Identification for Fire-Suppression Piping and Equipment, Fire Suppression Systems Insulation, Fire-Suppression Water Storage, Storage Tanks for Fire-Suppression Water
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Hangers and Supports for Plumbing Piping and Equipment, Identification for Plumbing Piping and Equipment, Plumbing Insulation, Plumbing Piping and Pumps, Facility Water Distribution, Domestic Water Piping, Facility Potable-Water Storage Tanks, Plumbing Fixtures, Gas and Vacuum Systems for Laboratory and Healthcare Facilities, Gas Systems for Laboratory and Healthcare Facilities, Gas Storage Tanks for Laboratory and Healthcare Facilities
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Hangers and Supports for HVAC Piping and Equipment, Identification for HVAC Piping and Equipment, Testing, Adjusting, and Balancing for HVAC, HVAC Insulation, Duct Insulation, Facility Fuel Systems, Facility Fuel-Storage Tanks, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, Air Duct Accessories, Dampers, HVAC Fans, Air Outlets and Inlets, Central HVAC Equipment
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Hangers and Supports for Electrical Systems, Low-Voltage Electrical Distribution
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Detection and Alarm, Fuel-Gas Detection and Alarm, Electronic Monitoring and Control, Electronic Detention Monitoring and Control Systems
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Excavation and Fill, Backfill
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Common Work Results for Exterior Improvements, Aggregates for Exterior Improvements, Bases, Ballasts, and Paving, Rigid Paving, Concrete Paving, Site Improvements, Screening Devices
Division 33 - Utilities

Division 33 - Utilities

Water Utilities, Water Utility Storage Tanks, Fuel Distribution Utilities, Fuel-Storage Tanks, Aviation Fuel-Storage Tanks, Compressed Gases Storage Tanks
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Bulk Material Processing Equipment, Piece Material Handling Equipment

Find More Local Projects

Within 75 Miles of This Project
556
Active Projects
345
Bidding Soon
5,107
All Active Projects
2,299
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 18, 2019

May 9, 2019

img_map_placeholder

43 Ronald Rd, Terryville, CT

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Gosinski Park Unit 31

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.