Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Demolition, site work, paving and new construction of a bridge / tunnel in Port Saint Joe, Florida. Working plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.
As of August 12, 2019. No bids were received. No further plans at this time. The project consists of the removal and replacement of one timber pedestrian bridge near Buck Griffin Lake in Port St. Joe. The bid will also include an alternate for a metal pedestrian bridge.\ The bid must conform to Section 287.133(3) Florida Statutes, on public entity crimes. Completion date for this project will be 30 days for Substantial Completion and 45 days for Final completion from the date of the Notice to Proceed presented to the successful bidder. Liquidated damages for failure to complete the project on the specified date will be set at $200.00 per day. If you have any questions, please contact Clay Smallwood at (850) 571-1217 or email at csmallwood@dewberry.com. The City of Port St. Joe reserves the right to waive informalities in any bid, to accept and/or reject any or all bids, and to accept the bid that in their judgment will be in the best interest of The City of Port St. Joe. All bids shall remain firm for a period of sixty days after the opening. The City of Port St. Joe is an Equal Opportunity Employer, Affirmative Action Employer. All bidders shall comply with all applicable State and local laws concerning licensing registration and regulation of contractors doing business to the State of Florida. If you have any questions, please contact Clay Smallwood at (850) 571-1217 or email at csmallwood@dewberry.com.
Final Planning
Bridges / Tunnels
$247,595.00
Public - City
Demolition, New Construction, Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 2, 2019
August 12, 2020
To Be Determined, Port Saint Joe, FL
Related To This Project
Port Saint Joe, FL
Bid Date: Dec 07 2018
Port Saint Joe, FL
--
Port Saint Joe, FL
Bid Date: Sep 24 2018
Port Saint Joe, FL
Bid Date: Mar 18 2022
Port Saint Joe, FL
Bid Date: Apr 12 2019
Repair and/or Replacement of the Washington Gym, Stac House, and Centennial Building Roofs - 3520074
Port Saint Joe, FL
Bid Date: Dec 11 2018
Port Saint Joe, FL
Bid Date: Feb 15 2019
Port Saint Joe, FL
--
Port Saint Joe, FL
Bid Date: Jan 10 2019
Port Saint Joe, FL
Bid Date: Jan 10 2019
Repair and/or Replacement of the Washington Gym, Stac House, and Centennial Building Roofs - 3520074
Port Saint Joe, FL
Bid Date: Dec 11 2018
Port Saint Joe, FL
Bid Date: Feb 15 2019
Port St Joe, FL
Bid Date: Dec 18 2020
Port Saint Joe, FL
--
Port St Joe, FL
Bid Date: Dec 07 2020
Recently Viewed
--
--
--
--
--
--
--
--
--
--
New Year, New Possibilities. Make the connections you need to kickstart 2025.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.