Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and new construction of a transportation facility in Birmingham, Alabama. Completed plans call for the construction of a transportation facility.
**As of November 17, 2020, the anticipated construction start date and completion date are not yet determined at this time. https://www.bizjournals.com/birmingham/news/2020/11/24/the-birmingham-xpress-project.html 10 hours ago Construction on a new bus system in the city of Birmingham is due to begin in December. The design phase for the $40 million Bus Rapid Transit project began in 2017, and construction was originally expected to be underway in August 2019. The BRT, to be called Birmingham Xpress, will connect 25 neighborhoods and travel from Woodlawn Transit Center on First Avenue North between 56th and 57th streets to the Crossplex Transit Center at the intersection of Avenue W and 47th Street Ensley. Charlotte Shaw, deputy director of the Office of Capital Projects Management at the city of Birmingham, said construction is now expected to start at West Transit Station in early December with stops and roadway work expected to be complete by the end of 2021. The project is currently in the final design phase. Shaw said the final construction phase will be completed at the East Transit Station by the end of April 2022. The full project is projected to be completed by May 2022. The system will operate in conjunction with MAX Transit. The new system will include 15 low-floor compressed natural gas buses equipped with wheelchair parking areas, bicycle racks and seating and standing room for 40 to 60 people. The project also calls for bus stations with raised passenger boarding platforms for faster access and new technology, including transit signal priority, which allows buses to change traffic lights to green, among other things, to improve travel times. _______________________________________________________________________________________ Plans call for the construction of a bus rapid transit system which will construct a 10 mile running from East to West. There will be two terminus stations. The Contractor shall submit a LUMP SUM BID which shall include all costs for the BX Birmingham Xpress, Bus Rapid Transit (BRT) West Terminus Station, for the City of Birmingham located at 4802 Avenue W, Birmingham, Alabama 35208 and all building systems, services and structures as required for this project (the "Project") as provided in these Construction Documents. It is the intent of these documents to require the Contractor to include in its bid all costs involved for the coordination of all trades to the successful completion of this Project as specifically outlined, required, or reasonably implied.
Award
Transportation Terminals
$3,253,379.00
Public - City
LEED Certification, New Construction, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 17, 2020
January 5, 2021
4802 Avenue W, Birmingham, AL
Related To This Project
Birmingham, AL
Bid Date: Oct 31 2018
Birmingham, AL
Bid Date: Dec 26 2018
Birmingham, AL
Bid Date: Nov 13 2018
Birmingham, AL
Bid Date: Nov 26 2018
Birmingham, AL
Bid Date: Nov 14 2018
Birmingham, AL
Bid Date: Oct 18 2018
Birmingham, AL
Bid Date: Feb 06 2019
Birmingham, AL
Bid Date: Feb 01 2019
Birmingham, AL
Bid Date: Aug 28 2019
Birmingham, AL
Bid Date: Jul 16 2019
Birmingham, AL
Bid Date: Jul 11 2019
Birmingham, AL
Bid Date: Sep 04 2019
Birmingham, AL
Bid Date: Oct 14 2019
Birmingham, AL
Bid Date: Oct 02 2019
Birmingham, AL
Bid Date: Aug 21 2019
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.