BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work for a water / sewer project in San Diego, California. Completed plans call for site work for a water / sewer project.

Otay 2nd Pipeline Project provides for the construction of 4,600 ft. (0.9 mile)of new 48-inch pipeline on Woodman Street between Imperial Avenue and Skyline Drive andabandoning of the existing 36-inch Otay 2nd Pipeline. The new 48-inch pipeline alignment will start at the 65th Street and Imperial Avenue and will run south crossing the trolley tracks. Then it will run east on Imperial Avenue turning south at Woodman Street and will end at Skyline Drive connecting to the existing Otay 2nd Pipeline. This new pipeline is proposed to feed the new Cielo and Woodman Pump Station. This project will relocate the existing Pressure Regulating Valve from the Imperial Avenue median, that presently posed safety hazard to maintenance personnel, to the easement South of Imperial Avenue and 65th Street. The Work shall be performed in accordance with: The Notice Inviting Bids and Plans numbered 40351-01-D through 40351-47-D, inclusive, and Traffic Control Plans 40351-T01-D through 40351-T40-D. This project is subject to compliance monitoring and enforcement by the DIR. A contractor or subcontractor shall not be qualified to bid on, be listed in a bid or proposal, subject to the requirements of section 4104 of the Public Contract Code, or engage in the performance of any contract for public work, unless currently registered and qualified to perform public work pursuant to Labor Code section 1725.5 It is not a violation of this section for an unregistered contractor to submit a bid that is authorized by Section 7029.1 of the Business and Professions code or by Section 10164 or 20103.5 of the Public Contract Code, provided the contractor is registered to perform publicwork pursuant to Section 1725.5 at the time the contract is awarded. A Contractor's inadvertent error in listing a subcontractor who is not registered pursuant to Labor Code section 1725.5 in response to a solicitation shall not be grounds for filing a bid protest or grounds for considering the bid non-responsive provided that any of the following apply: (1) the subcontractor is registered prior to bid opening; (2) within twenty-four hours after the bid opening, the subcontractor is registered and has paid the penalty registration fee specified in Labor Code section 1725.5; or (3) the subcontractor is replaced by another registered subcontractor pursuant to Public Contract Code section 4107. By submitting a bid or proposal to the City, Contractor is certifying that he or she has verified that all subcontractors used on this public work project are registered with the DIR in compliance with Labor Code sections 1771.1 and 1725.5, and Contractor shall provide proof of registration for themselves and all listed subcontractors to the City at the time of bid or proposal due date or upon request. Bid 10.0% Performance 100.0% Payment 100.0% Pre-Bid Meeting: No Online Q&A: No Project Duration:350 Working Days Liquidated Damages: $1,000 per day License Requirements: A Subcontracting participation percentagesapply to this contract.7.1. The City has incorporated mandatory SLBE-ELBE subcontractor participation percentages to enhance competition and maximize subcontracting opportunities. For the purpose of achieving the mandatory subcontractor participation percentages, a recommended breakdown of the SLBE and ELBE subcontractor participationpercentages based upon certified SLBE and ELBE firms has also been provided to achieve the mandatory subcontractor participation percentages: 1. SLBE participation 8.8% 2. ELBE participation 13.5% 3. Total mandatory participation 22.3% The Bid may be declared non-responsive if the Bidder fails to meet the following requirements: Include SLBE-ELBE certified subcontractors at the overall mandatory participation percentage identified in this document; O Submit Good Faith Effort documentation, saved in searchable Portable Document Format (PDF) and stored on Compact Disc (CD) or Digital Video Disc (DVD), demonstrating the Bidder made a good faith effort to outreach to and include SLBE-ELBE Subcontractors required in this document within 3 Working Days of the Bid opening if the overall mandatory participation percentage is not met. This Contract Will Be Subject to the Following: Phased-funding The City's Subcontracting Participation Requirements for Slbe Program Prevailing Wage Rates: State Apprenticeship

Bid Results

Water / Sewer

$9,363,015.00

Public - City

Subscribe For Documents

66 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
69
Active Projects
26
Bidding Soon
695
All Active Projects
319
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 21, 2019

August 20, 2019

img_map_placeholder

Woodman St, San Diego, CA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.