Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work for a road / highway in Green Bay, Wisconsin. Working plans call for site work for a road / highway.
https://fox11online.com/news/local/green-bay/brown-county-eyeing-1219-million-of-capital-improvement-work-in-2023 Brown County eyeing $121.9 million of capital improvement work in 2023 BROWN COUNTY (WLUK) -- Brown County has a $738 million list of projects it hopes to get done in the next six years, and on Tuesday evening, the first of a handful of committees signed off on a plan that calls for 16% of the work to get done next year. If you've been to Austin Straubel International Airport recently, you've seen its exterior is getting freshened up. You might consider it an appetizer of what could be coming with about $32 million worth of projects penciled in for next year. "Really, most of it is just rehabilitating and reconstructing surfaces that have aged beyond their useful life," said Marty Piette, the airport's director. "Chances are, we don't get funding for everything on our wish list, and it just gets slid down into a further year, but we want to be optimistic and budget optimistically that we will get a lot of the grant funding that we request." If the work doesn't get done next year, it will slide further into Brown County's capital improvement plan. The plan, which the airport is just one piece of, forecasts the next six years of infrastructure work. While next year's work is mostly set from when the county instituted a half percent sales tax four years ago, projects from 2024 through 2028 need to be mapped out in greater detail after the county board extended the sales tax last week. It was originally supposed to end at the end of 2023. "Starting this fall and into next year, we'll begin these conversations, and talking about after we get our facilities study done, to look at what the most needs are and then work with you, the committee, to start developing the next five-year CIP (capital improvement plan)," Brown County Director of Administration Chad Weininger told the county's planning, development and transportation committee. Most of the county's work in 2023 will be paid for through sales tax revenue and the county's allotment from the American Rescue Plan Act, according to Weininger. It includes about $10 million of road work. "No different than anything at your house, you see that room is the worst room in the house, you go and fix that one first," said Paul Fontecchio, Brown County's highway director. "Kind of the same thing with the roads and bridges." One of the top priorities next year is starting the work to make the Packerland Drive and Mason Street intersection on Green Bay's west side safer. Work will also begin on reconstructing part of Lineville Road from two lanes to four. Some other big projects for the county next year include making a single-point entrance at the courthouse and design work for the southern bridge. The full county board will eventually vote on the six-year outlook and then later vote on next year's work as part of the county's 2023 budget. _________________________ West Mason Street, City of Green Bay Military Avenue - 12th Street Traffic Signals / Upgrades Intelligent Transportation Systems (ITS) Estimate Anticipated Funding $1,000,000 - $1,999,999 As of December 02, 2019, the project is in final planning status. Anticipated letting date is February 25, 2020. WisDOT - West Mason Street, City of Green Bay - Traffic Signals / Upgrades *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.
Final Planning
Roads / Highways
$2,000,000.00
Public - State/Provincial
Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 8, 2023
W Mason St, Green Bay, WI
Related To This Project
Green Bay, WI
Bid Date: Sep 19 2023
Green Bay, WI
Bid Date: Jun 27 2023
Green Bay, WI
--
Green Bay, WI
Bid Date: Jan 13 2022
Green Bay, WI
--
Green Bay, WI
--
Green Bay, WI
Bid Date: Jul 11 2023
Green Bay, WI
Bid Date: Jul 11 2023
Green Bay, WI
Bid Date: Jun 27 2023
Green Bay, WI
Bid Date: Jun 13 2023
Green Bay, WI
Bid Date: Jun 20 2023
Green Bay, WI
Bid Date: Jun 05 2023
Green Bay, WI
Bid Date: Apr 29 2020
Green Bay, WI
--
Green Bay, WI
Bid Date: Jun 08 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.