BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 17, 2022 at 7:00 PM

Updated November 15, 2023

Demolition, site work, paving and new construction of a mixed-use development in Menomonee Falls, Wisconsin. Completed plans call for the demolition of a bridge / tunnel; for site work for a bridge / tunnel; for the construction of a bridge / tunnel; and for paving for a bridge / tunnel.

Waukesha County WISC 2022 201; Local Street; 0.038 Miles; Excavation Common, Excavation Marsh, Borrow, Backfill Structure, Base Aggregate Dense, Breaker Run, Concrete Pavement, Concrete Masonry Bridges, Prestressed Girders, HS Bar Steel Reinforcement, HS Bar Steel Reinforcement Coated, Piling CIP, Pavement Marking, Construction Staking, Storm Sewer, Concrete Curb and Gutter, Concrete Curb, Concrete Sidewalk, Asphaltic Surface, HMA Pavement, Tack Coat, Signs, Special Concrete Curb and Gutter, Railing Steel, Traffic Control. Estimated Range - $1,000,000 - $1,999,999 With each sealed proposal, the bidder must include a properly executed bid bond or a cashiers check, certified check, bank's check, or postal money order in the amount designated on the Highway Work Proposal made payable to the Department. Certified checks shall be drawn on the account of the bidder submitting the proposal. The bidder may also satisfy the proposal guaranty requirements by having a properly executed annual bid bond on file with the Department. Contractors should submit all questions concerning plans and/or proposals through Website. This process is documented and can be found at Website. WisDOT - 016 Lilly Road, Bridge Over Menomonee River *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Proposal ID: 20220208016 The work under this contract shall consist of bridge replacement, removals, grading, base aggregate, HMA pavement, concrete curb and gutter, concrete sidewalk, storm sewer, restoration, traffic control, marking, staking, sawing, and all incidental items necessary to complete the work as shown on the plans and included in the proposal and contract.

Award

Bridges / Tunnels

$1,144,836.00

Public - State/Provincial

Demolition, New Construction, Paving, Site Work

Subscribe For Documents

24 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
462
Active Projects
297
Bidding Soon
2,042
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 8, 2022

April 11, 2022

Project location map

Lilly Rd, Menomonee Falls, WI

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.