BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 15, 2019 at 8:00 PM

Updated October 24, 2023

Site work for a water / sewer project in Gallup, New Mexico. Completed plans call for site work for a water / sewer project.

https://www.apnews.com/7d82488508784acead677923d82b2ea3 September 13, 2019 GALLUP, N.M. (AP) -- The U.S. Interior Department has awarded a nearly $84 million contract for a water pipeline in northwestern New Mexico. The pipeline is part of the larger Navajo-Gallup Water Supply Project that's been in the works for several years. It will deliver San Juan River water to more than 40 Navajo Nation communities, the Jicarilla Apache Reservation and the city of Gallup. The latest contract awarded to a Roanoke, Texas, company includes 30 miles of pipeline between the Navajo communities of Little Water and Naschitti. The work is scheduled to begin in January. The overall project includes 280 miles of pipeline, water treatment and pumping plants, and storage tanks. Interior Secretary David Bernhardt said Thursday that most of the work on the main line is either complete or under construction. _________________________________________________________________________________________________________________________________________________________________________________ NGWSP 4c-8: Starts approximately at pumping plant 3, estimated 20 miles South of Shiprock, along east side of US 491 approximately 29 miles South and terminates in the Naschitti Chapter Boundary, approximately 43 miles North of Gallup. Provide: Approximately 29 miles of 42-48 inch water transmission pipe including all; valves, air valves, and blow-offs, wash crossings, horizontal directional drills, jack and bore crossings, materials, personnel, equipment, labor, management, etc. to ensure a turnkey project is furnished to Reclamation IAW the specifications and drawings. Safety monitors, quality control personnel, and full-time surveying required, see specifications and preface documentation. Per the Reclamation Acquisition Regulation (RAR) - WBR 1436.204 - Disclosure of Magnitude - the estimated magnitude of construction is (d) More than $100,000,000.00. The deadline for questions and answers is hereby extended from close of business July 9, 2019 to close of business July 19, 2019.The Government anticipates releasing the amendment answering submitted questions no later than August 2, 2019.

Post-Bid

Water / Sewer

$100,000,000.00

Public - Federal

Subscribe For Documents

33 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
19
Active Projects
8
Bidding Soon
88
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 20, 2019

September 18, 2019

Project location map

To Be Determined, Gallup, NM

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.