BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 3, 2019 at 8:00 PM

Updated January 26, 2024

Site work for a mixed-use development in Huntington Beach, California. Completed plans call for site work for a sidewalk / parking lot.

Project Duration: 50 Calendar Days Liquidated Damages: $500.00 Per Calendar Day Bid Bond Percentage: 10% The project proposes the installation of a trash removal device at McCallen Park, located under the existing parking lot. The proposed continuous deflection separator (CDS) unit will intercept trash from a 93" storm drain mainline that runs along Delaware Street. This storm drain conveys storm flows and urban runoff from a 382 acre watershed.

Bid Results

Sidewalks / Parking Lot

$682,160.00

Public - City

Site Work

6

10

2

7

Subscribe For Documents

24 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
623
Active Projects
234
Bidding Soon
4,084
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 30, 2019

May 30, 2019

Project location map

To Be Determined, Huntington Beach, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.