BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a transportation facility in Kansas City, Missouri. Completed plans call for site work for a transportation facility; and for paving for a transportation facility.

The New Single Terminal and Parking at KCI project consists of approximately 1 million square foot terminal facility including curbside, ticketing lobby, TSA compliant security screening checkpoint, TSA compliant in-line Checked Baggage Inspection System and associated support areas, baggage claim areas, baggage make-up area and associated support functions. The facility will include secure concourses providing concessions and customer amenities. The facility will initially support 39 aircraft gates. Equipment to support air carrier operations in the terminal, including passenger boarding bridges, aircraft support systems (e.g., pre-conditioned air, ground power, potable water, etc.), communications infrastructure, common use communications system for City-controlled gates, information display systems (e.g., flight information display systems, baggage information display systems, etc.), inbound and outbound baggage handling systems, and applicable tenant finishes are included in the scope. Aircraft parking aprons and gates are designed for Group III category aircraft, with several gates capable of handling larger Group V aircraft. Twenty-five (25) Remain overnight (RON) aircraft parking positions are provided in proximity to the New Terminal. The non-movement area, including new deicing operation, will be monitored and controlled by virtual ramp control operation, supported by a network of cameras. Fourteen (14) deicing pads and associated collection system are included. The airside scope of work includes demolishing, repaving and re-striping of the existing apron and vehicle service roads (VSR) to align with the position of the new Terminal concourse and gates. In addition, the existing taxi lane network will be reconfigured to provide aircraft with efficient access between movement and non-movement areas. The scope includes relocating existing utilities and services, airfield lighting and guidance signage and communication infrastructure within the project boundary. A multi-level public parking structure with approximately 6,300 parking spaces adjacent to the terminal and connected to the landside terminal via pedestrian walkways. In addition, a covered pedestrian walkway from Existing Terminal B garage to the new terminal will be provided. Clark, Weitz, Clarkson, a Joint Venture (CWC) The New Single Terminal and Parking at KCI Subcontractor RFP/Q-Group 2 B Roadwork 05/20/19 Page 4 In addition to the parking structure, associated landside site development includes a new central utility plant and associated underground utilities, new at grade arrivals roads, an elevated roadway to departures, roadway network reconfiguration, surface parking, roadway lighting, roadway signage updates, and underground utility relocations. The Work includes environmental mitigation (if any); site grading and drainage; fencing; construction access roads and staging areas, among other things. The Project requires that provisions be made to maintain existing operations in Terminals B & C during construction of the new terminal. In addition, upon its completion, the New Terminal A and existing Terminals B & C may be in operation simultaneously for a period to be determined . Tentative Scope Review Meetings / Interviews Week of June 20 o Tentative recommendation of award to KCAD Week of June 26 o Tentative final negotiations and award Week of July 3 Tentative Executed Agreement and NTP Week of July 11 o Start work July 31, 2019 o Last date/time to submit questions regarding this RFQ/P 06/06/2019

Post-Bid

Transportation Terminals

$1,000,000.00

Public - City

Paving, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
61
Active Projects
30
Bidding Soon
753
All Active Projects
269
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 13, 2019

July 31, 2019

img_map_placeholder

775 Brasilia Ave, Kansas City, MO

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.