Site work and paving for a civil project in Steubenville, Ohio. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.

The Work consists of replacing approximately 11,560 feet of 6-inch-diameter water line and approximately 630 feet of 12-inch-diameter water line, replacement of 16 isolation valves ranging in size from 4-inch to 20-inch, pipe point repairs of leaking pipe ranging from 4-inch-diameter to 20-inch-diameter to repair identified leaks. The Work includes, but is not limited to, excavation, bedding, backfill, paving, restoration, traffic control, disinfection, and all other Work required in accordance with the Contract Documents. Bids will be received for a single prime Contract. Bids shall be on a lump sum and unit price basis. The date that the Bidding Documents are transmitted by the Issuing Office will be considered the Bidder's date of receipt of the Bidding Documents. Partial sets of Bidding Documents will not be available from the Issuing Office. Neither Owner nor Engineer will be responsible for full or partial sets of Bidding Documents, including Addenda if any, obtained from sources other than the Issuing Office. Bids shall be sealed in an envelope marked with the Owner Name, Project Name and the words "Sealed Bid". Bids will not be accepted by FAX or electronic method. Bid security shall be furnished in accordance with the Instructions to Bidders. Bidders shall submit proof of qualifications to perform the Work as described in the Instructions to Bidders. Minimum prevailing wage rates shall be paid according to the Contract Documents, and Bidders must comply with all requirements of the Instructions to Bidders. The Contractor shall ensure that employees and applicants for employment are not discriminated against because of race, age, color, religion, sex, national origin, or handicap status. No Bidder will be subjected to discrimination in consideration for this award. Pursuant to Ohio Revised Code Section 9.24, it is now mandatory that prior to awarding of contracts for goods, services or construction for the City of Steubenville, a search must be made on the FINDING AND RECOVERY DATABASE of the Auditor of the State of Ohio to determine if a prospective successful bidder has a finding against it for non-payment of an obligation to the State or political subdivision thereof. All bidders shall pay particular attention to the rules and regulations of the EQUAL OPPORTUNITY POLICY, and to the AFFIRMATIVE ACTION PLAN, throughout the term of the project. This procurement is subject to the EPA policy of encouraging the participation of small business in rural areas (SBRAs). The City of Steubenville reserves the right to accept or reject any and all bids and to waive all informalities. Bids may be held by the City of Steubenville for a period not to exceed sixty (60) days for the date of bid opening for the purpose of reviewing the bids and investigating the qualifications of Bidders prior to awarding of the Contract.

Post-Bid

Water / Sewer

$3,300,000.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Summary of Work, Work by Owner, Work Restrictions, Use of Site, Price and Payment Procedures, Allowances, Cash Allowances, Unit Prices, Contract Modification Procedures, Payment Procedures, Schedule of Values, Progress Payment Procedures, Administrative Requirements, Project Management and Coordination, Project Coordination, Construction Progress Documentation, Construction Progress Schedule, Submittal Procedures, Certificates, Special Procedures, Quality Requirements, Regulatory Requirements, References, Reference Standards, Quality Control, Testing Laboratory Services, Temporary Facilities and Controls, Vehicular Access and Parking, Temporary Roads, Traffic Control, Temporary Barriers and Enclosures, Temporary Barricades, Temporary Fencing, Temporary Controls, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Installation, Cutting and Patching, Cleaning and Waste Management, Closeout Submittals, Maintenance Data, Bonds, Warranties, Project Record Documents, Spare Parts, Extra Stock Materials, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Facility Remediation, Transportation and Disposal of Hazardous Materials
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Reinforcing Steel
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry, Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Architectural Woodwork
Division 09 - Finishes

Division 09 - Finishes

Flooring, Terrazzo Flooring, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Safety Specialties, Fire Protection Specialties, Fire Extinguishers
Division 12 - Furnishings

Division 12 - Furnishings

Furnishings and Accessories, Rugs and Mats, Runners
Division 21 - Fire Suppression

Division 21 - Fire Suppression

Fire Suppression, Common Work Results for Fire Suppression, Meters and Gages for Fire-Suppression Systems, General-Duty Valves for Water-Based Fire-Suppression Piping, Fire-Suppression Water Storage, Storage Tanks for Fire-Suppression Water
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, Meters and Gages for Plumbing Piping, General-Duty Valves for Plumbing Piping, Plumbing Piping and Pumps, Facility Potable-Water Storage Tanks, Gas and Vacuum Systems for Laboratory and Healthcare Facilities, Gas Systems for Laboratory and Healthcare Facilities, Gas Storage Tanks for Laboratory and Healthcare Facilities
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Meters and Gages for HVAC Piping, General-Duty Valves for HVAC Piping, Facility Fuel Systems, Facility Fuel-Storage Tanks, HVAC Air Distribution, HVAC Ducts and Casings
Division 26 - Electrical

Division 26 - Electrical

Electrical and Cathodic Protection, Facility Lightning Protection
Division 27 - Communications

Division 27 - Communications

Communications, Common Work Results for Communications, Communications Services
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Detection and Alarm, Fuel-Gas Detection and Alarm
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Moving, Grading, Fine Grading, Excavation and Fill, Excavation, Trenching, Dewatering, Fill, Backfill, Compaction, Erosion and Sedimentation Controls, Earthwork Methods, Soil Stabilization, Special Foundations and Load-Bearing Elements, Driven Piles, Bored Piles
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Common Work Results for Exterior Improvements, Soils for Exterior Improvements, Aggregates for Exterior Improvements, Bases, Ballasts, and Paving, Curbs and Gutters, Paving Specialties, Pavement Markings, Planting, Planting Preparation, Mulching, Turf and Grasses, Seeding
Division 33 - Utilities

Division 33 - Utilities

Water Utilities, Water Utility Storage Tanks, Fuel Distribution Utilities, Fuel-Storage Tanks, Aviation Fuel-Storage Tanks, Compressed Gases Storage Tanks, Electrical Utilities, Site Grounding, Site Lightning Protection
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
136
Active Projects
82
Bidding Soon
1,254
All Active Projects
538
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 17, 2019

July 17, 2019

img_map_placeholder

Multiple Locations, Steubenville, OH

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Phase II - Water System Improvements Water Line Replacement

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.