BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 28, 2022 at 8:00 PM

Updated November 14, 2023

Site work, paving, new construction and renovation of an educational facility in Spokane, Washington. Completed plans call for the construction of a 140,000-square-foot educational facility; and for site work for a educational facility.

**The owner has selected a Construction Manager. The project consists of a new replacement for Sacajawea Middle School (approximately 140,000 SF) on the current Sacajawea Middle School campus. Students will be onsite during construction and laydown and staging areas will be limited. New building construction will begin no later than March 15, 2022 and be substantially complete no later than July 29, 2023. Exterior improvements and landscaping substantially complete no later than October 31, 2023. Existing facility to remain fully operational during the project Approximate GMP value is $54,000,000 Questions should be addressed to Greg Forsyth, Capital Projects, Spokane Public Schools, 2815 E Garland Ave., Spokane, WA 99207-5889, (509) 354-5775, (509) 354-7178 Fax, via written or faxed correspondence, or via e-mail (gregoryf@spokaneschools.org). Design phase activities include involvement of General Contractor/Construction Manager to: (1) assist in development of schedules, cost estimates, value analysis, quality and phasing the work effort well before construction can start and provide added assurance that the project will be completed on time, and (2) be involved in the design stage of the project to provide services to address constructability, sub-bid contracting strategies, site constraints, and neighborhood concerns, staging, safety and the minimization of disruptions Final selection of the General Contractor/Construction Manager for these projects is dependent upon approval from Spokane Public Schools Board of Directors. Early Site Work - start and complete Summer 2021. Main Building Work - start Spring 2022, complete Summer 2023 Demolition and Final Site Work (Sacajawea Middle School only) - start Summer 2023, complete Fall 2023

Under Construction

Educational

$54,000,000.00

Public - City

New Construction, Paving, Renovation, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
43
Active Projects
26
Bidding Soon
282
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 21, 2021

March 15, 2022

Project location map

To Be Determined, Spokane, WA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.