BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Remodeling of an educational facility in Muskogee, Oklahoma. Completed plans call for the remodel of a educational facility.

Bid Package #1: Drywall & Ceilings Bid Package #2: Painting Bid Package #3: Casework Bid Package #4: Flooring & Ceramic Wall Tile Bid Package #5: Specialties Bid Package #6: HVAC Bid Package #7: Plumbing Bid Package #8: Electrical Bids received more than ninety-six (96) hours, excluding Saturdays, Sundays and holidays before time set for opening bids, as well as bids received after time set for opening bids, will not be considered and will be returned unopened. Bids will be publicly opened. Any Trade Contractor obtaining bidding documents must notify the office of the Construction Manager (Schilt Management Services, Inc, Austin Snow (918) 824-2800 of their intent to bid and provide a name, address, phone number, fax number, and email address to allow proper distribution of any future addenda. Periodically the Construction Manager will hold a Progress meeting with the trade contractors onsite. All trade contractors working onsite will be required to attend. These meetings will start for each trade contractor two weeks prior to the trade's start date. The trade contractor or his representative must attend these meetings. If the trade contractor sends a representative, the representative must be authorized to speak for the trade contractor. A Daily Report from the trade contractors may be required, at the discretion of the Construction Manager. Additional questions should be addressed to the Construction Manager, Schilt Management Services, Inc., Austin Snow at (918) 824-2800 or austin@schiltmanagement.com. 1) Drywall & Ceilings - Brookside Interiors - $24,125 2) Painting - Skyco Painting - $6,950 3) Casework - Parks Custom Cabinets - $11,160 4) Flooring & Ceramic Wall Tile - Davis Interiors - $26,500 5) Specialties - Felix Thomson - $25,496 6) HVAC - B&R Electric - $3,400 7) Plumbing - Hogle - $31,868 8) Electrical - Genesis 1:3 Electric - $5,900 Total :-$135,399

Bid Results

Educational

$135,399.00

Public - City

Remodeling

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
96
Active Projects
62
Bidding Soon
790
All Active Projects
344
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 3, 2019

May 20, 2019

img_map_placeholder

2403 N 41st St E, Muskogee, OK

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.