Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Create your *free account*
Fill in a few details to keep viewing projects.
You've used your *free project views*
Register today to keep viewing commercial construction projects bidding in your area.
With ConstructConnect Project Intelligence, you can:
- Filter 825,000+ active commercial projects down to the ones that fit your trade and area
- Reach the right people with contact info for 575,000+ construction companies
- See who's bidding before you put in the hours
- Get daily email updates and alerts on the projects you're watching
Published September 28, 2022 at 8:00 PM
Updated October 24, 2023
Site work, paving and renovation of a mixed-use development in Miami Beach, Florida. Completed plans call for site work for a playground / park / athletic field; sidewalk / parking lot; for paving for a sidewalk / parking lot; water / sewer project; and for the renovation of a office development.
Maurice Gibb Memorial Park is located at 1700 Purdy Avenue in Miami Beach. On October 19, 2012, petroleum contamination was identified during excavation work in the southeast corner of Maurice Gibb Park. As a result, Miami Dade County required the City to fully delineate the soil and groundwater contamination on the park property and to remediate areas with elevated contaminant levels A renovation of the park became necessary as soil remediation is required over most of the park's surface. The City developed a new design for the park with input from the community, which details the layout of the park elements, including the playground equipment, new plant material, earthwork, new signage, and new park furnishings. The design provided new uses such as a Fishing Pier, an Overlook, a Dog Park, and picnic areas that will increase recreational activities within the park. The new design also includes raising the existing seawall and extending the living shoreline to address sea level rise concerns. The park area will also be raised to address the environmental condition. A renovation of the park became necessary as soil remediation is required over most of the park's surface. The City developed a new design for the park with input from the community, which details the layout of the park elements, including the playground equipment, new plant material, earthwork, new signage, and new park furnishings. The design provided new uses such as a Fishing Pier, an Overlook, a Dog Park, and picnic areas that will increase recreational activities within the park. The new design also includes raising the existing seawall and extending the living shoreline to address sea level rise concerns. The park area will also be raised to address the environmental condition. The project receives funding from the Florida Inland Navigation District (FIND) and shall be subject to all the grant requirements. Q and A deadline: Sep 16, 2022 5:00:00 PM EDT
Post-Bid
Playgrounds / Parks / Athletic Fields
$4,000,000.00
Public - City
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 26, 2022
November 24, 2022
1700 Purdy Ave, Miami Beach, FL
Related To This Project
Miami Beach, FL
--
Miami Beach, FL
--
Miami Beach, FL
Bid Date: Feb 15 2023
Miami Beach, FL
Bid Date: Feb 03 2023
Miami Beach, FL
--
Miami Beach, FL
--
Miami Beach, FL
--
Miami Beach, FL
--
Miami Beach, FL
--
Miami Beach, FL
Bid Date: Mar 17 2023
Miami Beach, FL
--
Miami Beach, FL
--
Miami Beach, FL
--
Miami Beach, FL
--
Miami Beach, FL
Bid Date: Jun 27 2022
Unlock the Full Project List
Access every active project near you — get started today.
- 825,000+ active commercial projects tracked daily
- Verified contact info for the GC, owner, and architect
- New leads delivered to your inbox every morning
Create your account to get started.
Takes less than a minute — no credit card needed