BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 20, 2019 at 8:00 PM

Updated October 24, 2023

Site work and paving for a road / highway in Hollister, California. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Engineer's Estimated Cost: $300,000 to $340,000 Project Duration: 30 Calendar Days Liquidated Damages: $3,000.00 Per Calendar Day Bid Bond Percentage: 10% Project Description: The project includes, but is not limited to improve John Smith Road by 0.33' Cold In-Place Recycling Subbase with a 0.15' HMA Concrete Overlay. Pre-Qualification for Bidders: Not Required License Type Required: A or C-12

Bid Results

Roads / Highways

$315,647.00

Public - County

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
347
Active Projects
162
Bidding Soon
1,986
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 16, 2019

June 17, 2019

Project location map

Fairview Rd, Hollister, CA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.