Demolition, site work, paving, new construction and renovation of a mixed-use development in Bellaire, Michigan. Design plans call for the renovation of a detention facility; detention facility; and for the demolition of a detention facility.
As of October 11, 2023, this project still hasn't moved forward, but there is a possibility for a May 2024 Millage vote. The consultant completed a feasibility study. An architect has not been selected. Due to the preliminary nature of this project, a timeline for bidding and construction has yet to be announced. The Antrim County community is discussing options to replace or renovate the aging jail and administrative buildings. The County presented options for this project at a meeting on April 23, 2019. Those options identified in the Master Plan are Option F, Option G, Option H and Option I, described below. These descriptions reflect the first phase of construction that the city wants to accomplish in the next five years. Option F: Re-use existing jail and administrative campus All facilities remain would remain on the existing campus. The Grove Street Annex and bank would be demolished, and a new Sheriff's Office and jail would be built The courthouse and administration building would be renovated. Pros: This plan has the lowest cost estimate. Considerations: Grove Street would need to be vacated to make space to reuse the existing buildings. Estimated cost of first phase: $22,379,945 - $ 25,904,878 Option G: Relocate all county buildings The county would gradually move buildngs to a remote site near M-88 and the Animal Control Office. The Sheriff's Office and jail would be built first, and the new courthouse and administration building would be installed in a secondary phase. Pros: This would allow the sale of current property and facilities and could make redevelopment of existing site. Considerations: This is the most expensive of all the options. Estimated cost of first phase: $24,271,080 - $ 28,206,931 Option H: Divided campus The jail and Sheriff's Office would be moved to M-88 while the courthouse and administration building would be renovated at their existing location. Pros: The demolition of the jail and Sheriff's office mean more parking downtown. Considerations: More costs to transport jail inmates between both campuses Early surveys from the county data show majority support for a new jail at m-88 site. Estimated cost of first phase: $24,732,921 - $ 28,743,665 Option I: Split campus and new construction The county would build a new jail and Sheriff's office at the remote site and new administration building and parking lot would be built on east side of current county campus. Pros: More parking or room for development Considerations: More costs related to transport between facilities Estimated cost of first phase: $24,550,022 - $ 28,531,106
Design
Jails / Prisons
$28,000,000.00
Public - County
Demolition, New Construction, Paving, Renovation, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 14, 2024
107 Grove St, Bellaire, MI
Related To This Project
Bellaire, MI
Bid Date: Apr 18 2022
Bellaire, MI
Bid Date: Jul 20 2022
Bellaire, MI
Bid Date: Aug 11 2022
Bellaire, MI
Bid Date: Aug 11 2022
Bellaire, MI
Bid Date: Aug 29 2022
Bellaire, MI
Bid Date: Aug 03 2022
Bellaire, MI
Bid Date: Mar 03 2023
Bellaire, MI
Bid Date: Mar 03 2023
Bellaire, MI
Bid Date: Oct 24 2022
Bellaire, MI
Bid Date: Oct 14 2022
Meridian charter Township, MI
Bid Date: Apr 22 2022
Kalamazoo, MI
Bid Date: Mar 15 2021
Detroit, MI
Bid Date: May 09 2022
Meridian charter Township, MI
Bid Date: Apr 22 2022
Lake Orion, MI
Bid Date: May 09 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.