EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published January 20, 2022 at 7:00 PM

Updated October 1, 2024

Demolition, site work, paving and new construction of a mixed-use development in Mount Horeb, Wisconsin. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; sidewalk / parking lot; road / highway; and sidewalk / parking lot.

Dane County; 5728-00-73; Local Street; 0.024 Miles; Excavation Common, Backfill Structure, Base Aggregate Dense, Select Crushed Material, Concrete Masonry Bridges, HS Bar Steel Reinforcement, HS Bar Steel Reinforcement Coated, Piling Steel, HMA Pavement, Tack Coat, and Construction Staking. Estimate Range - $250,000 - $499,999 With each sealed proposal, the bidder must include a properly executed bid bond or a cashiers check, certified check, bank's check, or postal money order in the amount designated on the Highway Work Proposal made payable to the Department. Certified checks shall be drawn on the account of the bidder submitting the proposal. The bidder may also satisfy the proposal guaranty requirements by having a properly executed annual bid bond on file with the Department. Contractors should submit all questions concerning plans and/or proposals through Website. This process is documented and can be found at Website. Contract Completion Time: 25 Working Days WISDOT - 17 - Town of Perry, Drammen Vallery Road, Pleasant Valley Br. Bridge, B-13-0691 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. The work under this contract shall consist of grading, base aggregate dense, HMA pavement, removal of Structure P-13-224, erosion control items, finishing items, Structure B-13-0691 and all incidental items necessary to complete the work as shown on the plans and included in the proposal and contract.

Award

Bridges / Tunnels

$318,997.00

Public - State/Provincial

Demolition, New Construction, Paving, Site Work

Subscribe For Documents

19 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
103
Active Projects
66
Bidding Soon
718
All Active Projects
386
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 14, 2021

January 13, 2022

img_map_placeholder

Drammen Valley Rd, Mount Horeb, WI

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.