BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 24, 2019 at 8:00 PM

Updated January 25, 2024

Site work for a water / sewer project in Bethalto, Illinois. Design plans call for site work for a water / sewer project.

The Moro Public Water District Plans to install a second water meeting from Bethalto Water to a location on Moreland Road near Parkside School; and both eight-inch and six-inch water lines east to Heartland Meadows subdivision then to Kennedy, connecting to Moreland Road. The County of Madison recently approved matching funds for this project. As of May 7, 2019 this project is in design. An awarded designer is identified. Contractor selection and a firm timeline has not been established.

Design

Water / Sewer

$1,750,000.00

Public - County

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
200
Active Projects
93
Bidding Soon
1,374
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 1, 2019

Project location map

South Moreland Rd, Bethalto, IL

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.