Renovation of a laboratory facility in Pittsburgh, Pennsylvania. Completed plans call for the renovation of a 22,000-square-foot laboratory facility.

As of October 7, 2022, the construction on this project was completed in September 2021. The existing 21,739 SF Ostermayer Lab Building renovation will include the complete interior renovation of the building, upgrading of all mechanical and electrical equipment, roof replacement, and upgrading of two building entrances. Design Assist RFP Process: May 10, 2019 - May 20, 2019 Design Assist Interviews: May 21, 2019 - May 23, 2019 Design Assist Awards: May 24, 2019 Design Assist Preconstruction Phase May 24, 2019 - October 2019 Construction Start: November 2019 Substantial Completion: December 2020 The approximate values for the Design Assist packages are as follows - Total Project is ~22,000 SF: HVAC/Plumbing $2.5M - $3.5M Electrical $1M - $1.5M Fire Protection: $150K - $250K Lab Casework and Equipment: $1M - $1.5M Turner Construction is the general contractor for the upcoming Penn State Ostermayer Lab Renovation Project in McKeesport, PA. The designer of record for the project is Bohlin Cywinski Jackson (BCJ). This project includes the complete internal renovation of the building, upgrading of all mechanical and electrical equipment, roof replacement, and upgrading of building entrances. The existing classrooms, labs, and student spaces will all be fully renovated to meet current standards. At this time, we are soliciting RFQs and eventually RFPs for the Design Assist scope of work, which involves the evaluation and development of the design with the project team and design team to guarantee cost, scope, coordination and design intent. The A/E will be the designer of record with the Design Assist Subcontractors to provide design development deliverables thru the design process. After the review of all submitted qualification packages, selected subcontractors will be sent a Request for Proposal (RFP). One subcontractor per trade package will be selected to proceed with Design Assist services. The objectives for pursuing Design Assist for this package include: 1. Safety Approach & Planning: Align safety requirements and priorities within the design assist program and maintain safety compliance throughout the life of the project 2. Cost & Estimating: Develop and maintain a construction cost estimate for your trade package during each phase of design. Adherence to the project budget will be essential for this project. Value Engineering ideas and design assistance will be required if trade package costs exceed target package value. 3. Coordination: We are looking for awarded team members to be integral in leading the design planning and coordination processes and constructability so that the work can be planned ahead of time for a smooth and seamless installation in the field. BIM Modeling will be utilized to ensure that all work is coordinated during preconstruction to reduce or eliminate field concerns. 4. Schedule: The early release of a design assist package will allow for improved coordination, expedited submittals and procurement of equipment that would not be available under a traditional design/bid/build procurement method. Create and maintain a detailed project schedule. The schedule shall clearly depict all tasks, including durations and dependencies, and the tasks that are on the critical path. 5. Overall, we are looking for a collaborative team member to work hand in hand with Turner Construction, Penn State University, Bohlin Cywinski Jackson (BCJ), and CJL to help ensure the overall success of the project objectives. Turner Construction Form-36 Contract Terms and Conditions, dated July 02, 2018. This document will be made available by Turner Construction. If there are any questions, please feel free to contact me at (248) 794- 5965 or via email at akrehl@tcco.com The Method of Contractor Selection has not been determined at this time.

Occupancy

Laboratories

$14,000,000.00

Public - State/Provincial

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
92
Active Projects
43
Bidding Soon
836
All Active Projects
325
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 1, 2020

img_map_placeholder

To Be Determined, Pittsburgh, PA

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.