Site work and renovation of a water / sewer project in Traverse City, Michigan. Conceptual plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.

U{DATE : Recommended in 2022 Tetra Tech lift station engineering analysis; It is recommended to replace the entire existing force main with 20-inch diameter pipe. Force main replacement should include the addition of a magnetic flow meter, which could be located in a vault downstream of the station. Consideration for pumping improvements should be deferred until after the force main is replaced. The existing stand-by pumping arrangement and stand-by power generator are adequate, although recommendations for improving the generator exhaust system are described with architectural improvements recommended in Appendix A – Technical Memorandum: Architectural and Structural Condition Assessment. Recommended improvements related to capacity are recommended in Appendix C – Technical Memorandum: Front Street Lift Station Capacity Analysis Project is in City of Traverse City capital budget fy 2025-2031 CIP ____________________________________________________________________ The Front Street Lift Station has VFDs in place that have an estimate in service life of 6 years these VFDs will be in service 9 years by 2021-2022. The lift stations wet well, bypass capability, piping, metering, and pumps should be upgraded to add dependability and functionality. This cost is an estimate and will be subject to change once the 2020-2021 engineering study has been performed As of April 23, 2025, this project is currently in the City of Traverse City's FY 2024-2029 CIP. Design has not started as of yet. Information regarding a design firm and the general contractor selection timeline has not been disclosed. A firm construction timeline has not been established. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Water / Sewer

$3,680,000.00

Public - City

Renovation, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
38
Active Projects
14
Bidding Soon
234
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 1, 2026

Project location map

E Front St, Traverse City, MI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.