Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and new construction of a museum in Charlotte, North Carolina. Completed plans call for the construction of a 25,832-square-foot museum.
*This prequalification is REQUIRED TO BE SUBMITTED in order to be able to bid on the job. *We just want to remind everyone that this correspondence is for the prequalification period only. *This job does require a project specific prequal, so even if you are prequalified with Rodgers Builders or Mecklenburg county, you will still be required to submit. In order to bid the job in the near future, you will need to be prequalified. Rodgers Builders has been selected as the Construction Manager for the Discovery Place Nature Project. The project consists of demolition of the existing Nature Museum, extensive sitework, and a 26,000 SF new construction building that will serve as the new Discovery Place Nature Museum. See the prequalification form (form is located in the Files of this "project") for the list of bid packages (also listed below and is subject to change) and estimated values and prequalification requirements. Unfortunately, previous prequalification with Rodgers does not count toward prequalification for this project. We need a prequalification submittal for this project. Prequalification submittals are due by December 02, 2022. Email the complete prequalification application to William Satterfield at wsatterfield@rodgersbuilders.com 02A Selective Building Demolition 03A Complete Concrete Sub and Superstructures 04A Masonry 05A Structural and Miscellaneous Steel 06A Wood Structures 06B Carpentry and Casework 07A Roofing and Accessories 07B Waterproofing and Sealants 07C Fireproofing 07E Exterior Perforated Corrugated Metal Panels 08A Glass Assemblies 08B Passage Door Assemblies 09A Drywall Assemblies 09C Acoustical Assemblies 09D Hard Tile & Stone 09E Floor Coverings - Resilient & Carpeting 09F Painting 09L Terrazzo Flooring 10A Specialties 10B Signage 12A Window Treatments 14A Elevators 18A General Works 18B Final Cleaning 21A Fire Protection 22A Plumbing Systems 23A HVAC 26A Electrical Systems 31A Complete Sitework 31C Deep Foundation Systems 32C Landscape and Irrigation 32D Fencing Project milestone dates (subject to change) are: November 16, 2022: Project Information and Outreach Session December 02, 2022: Project Prequalification phase Closed December 19, 2022: Issue invitation to Bid January 5, 2023: Prebid Meeting February 7, 2023: Bid Opening 3rd Quarter 2023 : Start Construction 1st Quarter 2025: Construction Completion Total Project Budget- 41,447,692 *Updated Application has been released. *Outreach Presentation and Sign In Sheet The outreach presentation and sign in sheet has been uploaded for your use. Thank you to those who were able to attend. Just want to emphasize that there is a 23% goal on this project for MWBE inclusion. Please continue to use Rodgers and Mecklenburg county as a resource to help find business diversity and inclusion. Feel free to reach out to Jenene Seymour JSeymour@RodgersBuilders.com and Ellie Festger Ellie.Festger@MeckNC.Gov to acquire a list of approved vendors or if you know someone who needs assistance getting certified. Also, please be sure to select bidding if you intend to submit a prequalification application. Reminder that the prequalification period will close on 12/02. Please do not wait until the last minute.
Award
Museum
$41,447,692.00
Public - County
New Construction, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 16, 2022
August 21, 2023
1658 Sterling Rd, Charlotte, NC
Related To This Project
Charlotte, NC
--
Charlotte, NC
--
Charlotte, NC
Bid Date: Dec 15 2022
Charlotte, NC
--
Charlotte, NC
--
Charlotte, NC
--
Charlotte, NC
Bid Date: Sep 14 2022
Charlotte, NC
--
Charlotte, NC
Bid Date: Nov 28 2022
Charlotte, NC
Bid Date: Dec 02 2022
Charlotte, NC
Bid Date: Dec 01 2022
Charlotte, NC
Bid Date: Jun 22 2021
Charlotte, NC
Bid Date: Dec 15 2022
Charlotte, NC
Bid Date: Dec 06 2022
Charlotte, NC
Bid Date: Dec 12 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.