BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 30, 2022 at 8:00 PM

Updated November 15, 2023

Site work and paving for a road / highway in Penticton, British Columbia. Completed plans call for paving for a road / highway.

Construction of a separated bike lane route between Okanagan and Skaha Lakes. TIMELINE: Tender for Lake-to-Lake Bike Lane, bid # 2021-Tender-08, closed May 03, 2022, was awarded to Grizzly Excavating. Sections 3 and 4 of the Lake-to-Lake Bike Route were completed in 2021 and construction of section 2 will begin in late April 2022. Construction will focus on portions of the following roads, with most work typically proceeding north to south: Lanes (between Fairview and Duncan Ave) Duncan Ave (between lanes and Atkinson Street) Atkinson St. (from Duncan Ave through to Kinney Ave) Kinney Ave (from Atkinson through to South Main Street).

Under Construction

Roads / Highways

$15,000,000.00

Public - City

Paving, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
19
Active Projects
0
Bidding Soon
167
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 29, 2022

Project location map

Multiple Locations, Penticton, BC


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.