BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 9, 2023 at 7:00 PM

Updated January 26, 2024

Demolition, site work, renovation and addition to a mixed-use development in Rogersville, Missouri. Completed plans call for the addition of a educational facility; for site work for a educational facility; and for the demolition of a educational facility.

Any questions or inquiries can be sent via email to Chris Ball (cball@jbapc.com). Hourly wages, as set forth by the Department of Labor and Industrial Relations and the prevailing wage law, will be complied with on this project. The CMaR and School Board reserve the right to accept or reject any or all bids and waives any informality in the bidding. The bidder acknowledges the right of the CMaR and/or Owner to reject any or all bids and to waive any informality or irregularity in any bid received. In addition, the bidder recognizes the right of the Owner to reject a bid if the bidder failed to furnish any bid security, or to submit the data required by the bidding documents, or if the bid is in any way incomplete or irregular. liquidated damages, the sum of four hundred dollars ($400.00) for each calendar day Bid results: Sitework-Carl Whorton- 98,520.00 Paving-APAC- 59,650.00 Precast Concrete-Prestressed Casting -536,000.00 Lightweight Insulating Concrete-Nettles Construction -45,000.00 Unit Masonry-Jerry Bennett Masonry 736,000.00 Structural Steel & Rebar- Builders Rebar 63,710.0 Roofing-Stiles Roofing- 657,851.00 Caulking-Atkins Weatherproofing -37,820.00 Metal Doors & Frames-Ron Miller Hardware- 51,700.00 Wood Doors-Ron Miller Hardware- 20,275.00 Storefronts & Glass-Architectural Building Products- 163,858.00 Ceilings-Jump Ceilings 86,745.00 Flooring-Zickel 47,900.00 Painting-Kevco Industries 47,450.00 Fire Extinguisher Cabinets-Ron Miller Hardware 800.00 Toilet Accessories-Ron Miller Hardware 950.00 Fire Supression -Faith Fireproofing 45,132.00 Plumbing-Kimberly City Plumbing 245,850.00 Mechanical-Long Refrigeration -817,652.00 Electrical-Meyer Electric 470,250.00 Finish Hardware Contractor-Ron Miller Hardware 39,250.00

Bid Results

Educational

$4,272,363.00

Public - City

Addition, Demolition, Renovation, Site Work

57

22

13

2

Subscribe For Documents

24 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
101
Active Projects
55
Bidding Soon
739
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 14, 2022

February 14, 2023

Project location map

To Be Determined, Rogersville, MO

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.