Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published May 25, 2021 at 8:00 PM
Updated April 9, 2025
Site work for a water / sewer project in Gurnee, Illinois. Completed plans call for site work for a water / sewer project.
The North Shore Water Reclamation District hereby gives notice that sealed Bids will be received for the First Stage Aeration Piping at the Gurnee Water Reclamation Facility. The work generally consists of installation of approximately 350 linear feet of above-ground steel aeration piping, expansion fittings, connection to existing 16-inch aeration distribution piping, pipe supports, minor site grading, and asphaltic pavement patching. Subsurface condition reports: reports of explorations and tests of subsurface conditions used in preparing the bidding documents are on file for inspection at all offices listed for inspecting bidding documents. Copies are available at no cost and may be obtained when requesting bidding documents. Legal provisions: contractors and subcontractors shall conform to the "substance abuse prevention on public works projects act", (820 ilcs 265/1 et seq.); and with the provisions of 29 cfr part 470. Wage rates: this contract calls for the construction of a "public work," within the meaning of the illinois prevailing wage act, 820 ilcs 130/.01 et seq. ("the act"). The act requires contractors and subcontractors to pay laborers, workers and mechanics performing services on public works projects no less than the "prevailing rate of wages" (hourly cash wages plus fringe benefits) in the county where the work is performed. The prevailing rate of wages are revised by the illinois department of labor and are available on their official website at: http://www.Illinois.Gov/idol/laws-rules/conmed/pages/prevailing-wage-rates.Aspx. If the department of labor revises the prevailing rate of hourly wages to be paid by the public body, the revised rate as provided by the public body shall apply to this contract. All contractors and subcontractors rendering services under this contract must comply with all requirements of the act including, but not limited to, all wage, notice, and record keeping duties. Pre-bid conference: a pre-bid conference will be held prior to the bid opening on the 28th day of april 2021, at 10 a.M. At the north shore water reclamation district, 14770 west william koepsel drive, p.O. Box 750, gurnee, il 60031, to clarify any questions from the potential bidders. Bid security: bid security in the amount of not less than 5% of the bid shall accompany each bid in accordance with the instructions to bidders. Contract security: the bidder to whom a contract is awarded shall furnish a performance bond and a payment bond each in an amount equal to the contract price. Bid rejection/acceptance: owner reserves the right to reject any and all bids, waive informalities in bidding, or to accept the bid or bids, which best serves the interests of owner. Bid withdrawal: no bid shall be withdrawn for a period of 60 days after the scheduled opening of the bids without the consent of owner.
Bid Results
Water / Sewer
$975,000.00
Public - County
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 17, 2021
June 16, 2021
14770 William Koepsel Dr, Gurnee, IL
Related To This Project
Gurnee, IL
Bid Date: May 09 2025
Gurnee, IL
Bid Date: Jun 04 2025
Gurnee, IL
Bid Date: Jun 09 2025
Gurnee, IL
Bid Date: Jun 26 2025
Gurnee, IL
Bid Date: Jun 20 2025
Gurnee, IL
Bid Date: Jun 24 2025
Gurnee, IL
Bid Date: Nov 09 2021
Gurnee, IL
Bid Date: Apr 16 2025
Gurnee, IL
Bid Date: Apr 07 2025
Gurnee, IL
Bid Date: Apr 25 2025
Gurnee, IL
Bid Date: Apr 07 2025
Gurnee, IL
Bid Date: Apr 14 2025
Gurnee, IL
Bid Date: Apr 14 2025
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
