Site work and renovation of a water / sewer project in Jurupa Valley, California. Completed plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.

For Jurupa Hills Liftstation Replacement Project The Contract Work site is located within the City of Jurupa Valley in the portion of the Rubidoux Community Services District as shown on Sheet 1 of the Construction Drawings. The project is located on the south west corner of Jurupa Hills Country Club. Access to the site is located along Linares Avenue, 300' east of Pico Avenue. The project requires connections and abandonment work at the end of the access road. All material and equipment storage shall be confined to the immediate area south of the existing site. The Contract work to be performed hereunder includes the furnishing of all labor and equipment and furnishing and installing all materials, unless herein specifically excepted, necessary for the complete and satisfactory construction of the JURUPA HILLS LIFT STATION REPLACEMENT, including connection to existing sewer system, construction of new sewer system infrastructure and demolition and abandonment of required existing facilities. The work shall consist of all traffic control (including furnishing and installing all barricades, signs, delineators, and flagmen); all utility location and verification (excavating, exposing, and verifying top, bottom, and side of utility facility); all pavement removal and disposal; all earthwork (including trenching, shoring, sloping, blasting if required, disposal, bedding, and backfilling including select imported material or select native material); compacting; furnishing and installing all pipe, fittings, manholes, laterals; temporary plugging, diverting or bypass pumping required for making all related connections; abandoning existing manholes, piping, connecting to vault and electric panel, protecting in place or removing and replacing all existing improvements; replacing all existing gravel, asphalt concrete pavement including asphalt concrete overlays removed, damaged or destroyed during construction; pavement striping and restriping; removing and replacing all Portland Cement concrete improvements removed, damaged or destroyed during construction; replacing destroyed survey monuments; disposing of excess soil and rock material and restoring all areas and improvements to pre-construction conditions. Contractor shall, upon completion of all construction work required herein, initially operate all components of the Contract Work installed or furnished and installed by Contractor, and make any additional, adjustments, corrections, repairs, replacements, and reconstructions necessary to provide District with complete, correctly operating sewer system.

Award

Water / Sewer

$600,000.00

Public - City

Renovation, Site Work

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Quality Control, Temporary Facilities and Controls, Construction Facilities, Sanitary Facilities, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management, Closeout Submittals, Bonds
Division 03 - Concrete

Division 03 - Concrete

Cast-in-Place Concrete, Structural Concrete
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Joint Protection, Preformed Joint Seals, Joint Gaskets
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating
Division 12 - Furnishings

Division 12 - Furnishings

Furniture
Division 21 - Fire Suppression

Division 21 - Fire Suppression

Fire Suppression, Common Work Results for Fire Suppression, General-Duty Valves for Water-Based Fire-Suppression Piping
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps
Division 26 - Electrical

Division 26 - Electrical

Low-Voltage Electrical Distribution, Low-Voltage Switchgear
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Excavation and Fill, Excavation, Trenching, Fill, Backfill, Compaction
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Concrete Overlays, Common Work Results for Exterior Improvements, Aggregates for Exterior Improvements, Bases, Ballasts, and Paving, Curbs and Gutters, Planting
Division 34 - Transportation

Division 34 - Transportation

Transportation, Transportation Signaling and Control Equipment, Roadway Signaling and Control Equipment, Traffic Control Equipment
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Coastal Construction, Shoreline Protection
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
275
Active Projects
130
Bidding Soon
2,233
All Active Projects
1,077
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 11, 2019

July 11, 2019

img_map_placeholder

To Be Determined, Jurupa Valley, CA

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Jurupa Hills Lift Station Replacement Project

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.