BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 16, 2019 at 8:00 PM

Updated November 15, 2023

Site work and renovation of a mixed-use development in Thornton, Colorado. Completed plans call for the renovation of a detention facility; and for site work for a water / sewer project.

Phased Expansive Soil Mitigation, Sally Port Reconstruction, Site Work Trades Required: Surveying, Quality Control, Demolition, Ready Mix, Masonry, Steel, Waterproofing, Joint Sealant, Pavement Markings, Plumbing, Mechanical, Electrical, Geosynthetics, Earthwork, Utilities, Caisson Drillers, Retaining Wall, Asphalt Paving, Fencing, Landscaping Anticipated Construction Schedule: Phase A - 8/31/19 to 11/24/19 Phase B&C - 4/20/20 to 10/31/20 The owner has determined a prequalified list of contractors. The Project is to mitigate issues related to expansive foundation materials along the west side of the Thornton Police Department wing of the existing Thornton Justice Center. The Work generally includes removal and replacement of asphalt pavement and concrete flatwork, excavation of existing subgrade and installation of a geomembrane liner and drainage systems, replacement of a mechanically stabilized earth wall, and full replacement of the existing Sally Port floor from slab on grade to a structural floor. The construction budget for this Project will be approximately two million dollars ($2,000,000). As of August 21, 2019, addendum 2 has been issued.

Award

Jails / Prisons

$1,346,991.00

Public - City

Renovation, Site Work

Subscribe For Documents

18 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
189
Active Projects
70
Bidding Soon
1,297
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 26, 2019

September 23, 2019

Project location map

9551 Civic Center Dr, Thornton, CO


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.