BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 19, 2019 at 8:00 PM

Updated March 22, 2024

Renovation of a conference / convention center in Boston, Massachusetts. Completed plans call for the renovation of a conference / convention center.

Boston Convention and Exhibition Center (BCEC) Exhibit Hall B and C Door and Frame Replacement. This project is for the removal of rated doors with transoms and replacing them with one pair of rated doors with a transom, and one single rated door with a transom within the same structural bay. The hardware and access control system will require replacement and the doors will be tied into the fire alarm system; within an occupied and operating facility, all as more fully set forth in the Specifications and Drawings.

Award

Conference / Convention Centers

$753,500.00

Public - City

Renovation

8

22

4

12

Subscribe For Documents

24 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
525
Active Projects
244
Bidding Soon
3,625
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 20, 2019

August 12, 2019

Project location map

415 Summer St, Boston, MA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.