BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 14, 2022 at 8:00 PM

Updated September 14, 2023

Site work and paving for a sidewalk / parking lot in Boynton Beach, Florida. Working plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

June 2022, construction documents are underway. Contractor bidding is expected to commence in the fourth quarter of 2022. *The previous solicitation is listed below for reference. --- The City of Boynton Beach is seeking the services of a qualified CONSULTING SERVICES to assist with the development of the Kimley-Horn Design plans into Final Engineering Design for the SE 1st Street Sidewalk Improvement project. The work will include designing the plan in 2020 and construction beginning in 2022. To support the application the City hired WGI to provide the design survey and Kimley-Horn and Associates to provide 30% civil engineering design plans. The SE 12th Avenue intersection improvements, less the 10ft multiuse path are intended to be constructed in advance of the 2022 grant funding for the construction of the SE 1st St multiuse path. The scope of the improvements will extend eastwardly beyond the limits of the 30% KHA plans. The scope for the improvements to SE 12th Ave will include what is shown on KHA plans plus the extension of a two-lane section from the 201+00 base line on the KHA plan eastward to Federal Highway. Parallel parking shall be provided on both sides of the road. Additionally at 208 SE 1st St, the Consultant shall provide up to three draft sketches showing the layout of the parking and potential layouts of the sites driveway and its on-site parking configurations. One sketch will be further developed into a more detailed sketch. These sketches will be used by the City to determine the final alignment of SE 12th Avenue. These SE 12th Ave plans will be required to permitted by the railway authorities as applicable.

Final Planning

Sidewalks / Parking Lot

$2,402,441.00

Public - City

Paving, Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
261
Active Projects
123
Bidding Soon
1,878
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 30, 2023

Project location map

SE 1st St, Boynton Beach, FL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.