BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a civil project in Aspinwall, Pennsylvania. Working plans call for site work for a road / highway; for paving for a road / highway; bridge / tunnel; bridge / tunnel; and water / sewer project.

As of 8/18/21, the owner has selected a Design Builder. A timeline for construction has not yet been established. This Is a Partial Design Build Project. Design Activities Are Limited to: Traffic Control Plan, Bridge Structure, and Slope Pipe for the Milling and Resurfacing, Concrete Pavement Preservation, Guiderail, Drainage, Signing and Pavement Marking, Bridge Preservation and Other Miscellaneous Construction, All Within a Length of 18,538.00 Linear Feet (3.511 Miles) as Indicated on the Approved Drawings for State Route 0028, Section A58 and State Route 0028, Section A62 (Allegheny Valley Expressway), in Allegheny County, Aspinwall Borough, City of Pittsburgh, Fox Chapel Borough, O'hara Township, Harmar Township, Springdale Township, Frazer Township, and East Deer Township, Commonwealth of Pennsylvania. This Project Being Situated as Follows: State Route 0028, Section A58, From a Point 50 Feet South of Delafield Ave Ramps at Segment 0190/0191 Offset 0247/0247 (Station 417+90.00) to a Point 250 Feet South of the Harmar Township Line at Segment 0240/0241 Offset 3866/3866 (Station 600+00.00). State Route 0028, Section A62, From a Point 250 Feet South of the Harmar Township Line at Segment 0240/0241 Offset 3866/3866 (Station 600+00.00 Nb/sb) to a Bailes Run Road at Segment 0370/0371 Offset 0668/0632 (Station 954+68.93 Nb/955+32.57 Sb) Project Cost Range: $15,000,000.00 - $19,999,999.99 Federal Project Status: PENNDOT Oversight Non-NHS Structure Work: 14.00% Let Type: Scheduled Pre-bid Meeting: None Wage Rates: Yes Prequalification Requirement: Yes State Type of Work: Resurfacing/overlays All inquiries must be submitted electronically to ECMS, Do not contact the owner or engineer contacts. PennDOT - RFP D/B - Design Activities Are Limited to: Traffic Control Plan, Bridge Structure, and Slope Pipe *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Pre-Construction/Negotiated

Bridges / Tunnels

$15,322,444.00

Public - State/Provincial

Paving, Site Work

585

26

76

5

Subscribe For Documents

37 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
97
Active Projects
39
Bidding Soon
786
All Active Projects
295
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 22, 2021

August 30, 2021

img_map_placeholder

PA-28, Aspinwall, PA

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.