BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work, paving and new construction of a bridge / tunnel in Boonville, Missouri. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

https://www.columbiamissourian.com/news/state_news/can-you-ride-a-bike-in-a-shipping-container-katy-trail-users-will-soon-find/article_c74c0fc0-1438-11ec-9910-27adbd950f0f.html When crews begin replacing a key highway bridge over the Missouri River this fall, their work won't just tie up traffic on Interstate 70. Below the bridge, running alongside the Missouri River's northern bank, is the Katy Trail, a 237-mile biking and pedestrian byway that stretches across the state. But the work up above to replace the bridge at Rocheport is not expected to completely shut down the Katy Trail. According to the Missouri Department of Transportation, the contractor is planning to create a makeshift tunnel by placing shipping containers along the crushed limestone path to protect trail users from falling debris. "We may need to close the trail on temporary basis throughout the project, but we will be coordinating with the Katy Trail staff to avoid any major events that may be planned on the trail," said MoDOT spokesman Adam Pulley. "If short duration closures are warranted, they are not anticipated to last longer than three or four days." Shipping containers, which can come in a variety of lengths, are typically about 8 feet wide and 8 1/2 feet tall. The steel boxes are used to ship products overseas but have begun being used for other purposes, including storage, homes and sheds. The Department of Natural Resources, which manages the trail, said it will begin monthly meetings in October to discuss the project's impact to the trail. "That said, we are working closely with MoDOT and the project team to minimize impacts to the trail," DNR spokeswoman Miranda Frederick said. "This is a major project and there will be impacts to the Katy Trail from time to time. These impacts could include short-term closures (30 minutes or less), temporary detours within the trail (right-of-way) and complete trail closures." Part of the trail near Rocheport has already been closed in order to replace a bridge over Salt Creek. That has meant trail users have had to take a sometimes frustrating detour onto nearby roads. Work could begin to replace the Salt Creek bridge soon. Bids for the project were opened Sept. 2. Up above the trail, on the bluffs above the river, the Interstate 70 bridge west of Columbia will be built in phases to minimize traffic delays on the busy, transcontinental highway. As part of their bid on the $240 million project, Wisconsin-based Lunda Construction Co. and Washington-based Parsons Transportation Group Inc. said workers will build one span to the north of the old bridge and open it to traffic by the late spring of 2023. Then they will remove the old span and begin building the second bridge. MoDOT hopes that will result in fewer backups among the 12.5 million vehicles that use the bridge each year. The current bridge was built in 1960 and is rated in "poor" condition. Replacing it is among the biggest projects in the pipeline in Missouri, alongside improvements to Interstate 270 in north St. Louis County and the replacement of the Buck O'Neil Bridge in Kansas City. Construction is expected to be completed by late 2024. ___________ https://www.wvnews.com/lunda-construction-team-awarded-220-million-i-70-missouri-river-bridge-design-build-project/article_6f93bd50-b933-5886-b96a-89297e0a08a3.html Jul 12, 2021 Tutor Perini Corporation (NYSE: TPC) (the "Company"), a leading civil, building and specialty construction company, announced today that a design-build team led by its subsidiary, Lunda Construction Company ("Lunda"), has been selected by the Missouri Department of Transportation for the design and construction of the new I-70 Missouri River Bridge near Rocheport, Missouri. Lunda's design team is comprised of Parsons Corporation (NYSE: PSN), Dan Brown & Associates and HZ United. The project consists of the design and construction of two Missouri River bridges, one in each direction of travel, each with three lanes, which will allow for construction to take place with a limited impact to traffic. Lunda is also replacing the County Road BB Bridge over I-70. Design work is expected to commence shortly after contracts are executed, with construction scheduled to begin later this year and substantial completion expected by the end of 2024. The construction budget for this project is $220 million. The contract value is anticipated to be included in the Company's third-quarter 2021 backlog. About Tutor Perini Corporation Tutor Perini Corporation is a leading civil, building and specialty construction company offering diversified general contracting and design-build services to private clients and public agencies throughout the world. We have provided construction services since 1894 and have established a strong reputation within our markets by executing large, complex projects on time and within budget while adhering to strict quality control measures. __________________________________________________________________ As of July 2, 2021, design is underway. According to a MoDOT timeline, proposals for the project will be due in June and the team will be selected in July. A Shortlist of Potential Project Contractors has been announced. Construction could start as early as Fall or Winter 2021, and the project is expected to be completed by the end of 2024. Non-disclosure Agreements are required prior to providing information to bidders. Project includes bridges, roadway, retaining walls, utilities We actively encourage MoDOT certified DBEs to submit proposals for a wide range of opportunities and welcome their participation on the I-70 Rocheport Bridge Design-Build Project.

Post-Bid

Bridges / Tunnels

$235,000,000.00

Public - State/Provincial

Demolition, New Construction, Paving, Site Work

3

4

3

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
46
Active Projects
25
Bidding Soon
330
All Active Projects
131
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 28, 2021

January 28, 2022

img_map_placeholder

I-70, Boonville, MO

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.