BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 21, 2026 at 7:00 PM

Updated January 22, 2026

Demolition, site work and new construction of a mixed-use development in Arlington, Virginia. Completed plans call for the construction of a retail development; for the demolition of a transportation facility; bridge / tunnel; transportation facility; and for site work for a transportation facility.

The Crystal City Station Improvements Project will relocate and replace the existing side platform, with a new island platform between two (2) relocated tracks. Access to the station will be provided via a pedestrian underpass beneath the westernmost track at the north end of the platform, and via a pedestrian bridge over the westernmost track at the south end of the platform. The north entrance will extend from the end of the platform northward, transitioning from a ramp to a tunnel which will pass over the existing Washington Metropolitan Area Transit Authority (WMATA) Metrorail tunnel, and beneath the proposed westernmost railroad track. This entrance extends beyond the railroad right of way to Crystal Drive on property adjacent to the Mount Vernon Trail Connector, providing Americans with Disabilities Act (ADA) compliant passenger access from Crystal Drive to the VRE platform. The south entrance will extend beyond the railroad right of way, spanning over and across the service road to the single-story building between 2011 Crystal Drive and 2121 Crystal Drive. The project will provide improvements to the existing single-story building to support the additional load and will construct a stair and elevator at the front of the single-story building. The project also includes construction of a realigned westernmost track, along the west side of the new island platform, and demolition of the existing station. The Scope of Work (SOW) shall include comprehensive construction management services for construction of a new island platform passenger station, track roadbed, a pedestrian underpass, a pedestrian bridge, structural modifications to an existing commercial building, and two (2) sets of stairs and elevators. The term of the Contract shall be thirty-seven (37) consecutive calendar months from the date set forth in the written Notice-To-Proceed (NTP).

Post-Bid

Transportation Terminals

$68,900,900.00

Public - State/Provincial

Demolition, New Construction, Site Work

3

11

2

2

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
129
Active Projects
5
Bidding Soon
1,750
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 20, 2026

April 19, 2026

Project location map

Crystal Dr, Arlington, VA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.