Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published January 21, 2026 at 7:00 PM
Updated January 22, 2026
Demolition, site work and new construction of a mixed-use development in Arlington, Virginia. Completed plans call for the construction of a retail development; for the demolition of a transportation facility; bridge / tunnel; transportation facility; and for site work for a transportation facility.
The Crystal City Station Improvements Project will relocate and replace the existing side platform, with a new island platform between two (2) relocated tracks. Access to the station will be provided via a pedestrian underpass beneath the westernmost track at the north end of the platform, and via a pedestrian bridge over the westernmost track at the south end of the platform. The north entrance will extend from the end of the platform northward, transitioning from a ramp to a tunnel which will pass over the existing Washington Metropolitan Area Transit Authority (WMATA) Metrorail tunnel, and beneath the proposed westernmost railroad track. This entrance extends beyond the railroad right of way to Crystal Drive on property adjacent to the Mount Vernon Trail Connector, providing Americans with Disabilities Act (ADA) compliant passenger access from Crystal Drive to the VRE platform. The south entrance will extend beyond the railroad right of way, spanning over and across the service road to the single-story building between 2011 Crystal Drive and 2121 Crystal Drive. The project will provide improvements to the existing single-story building to support the additional load and will construct a stair and elevator at the front of the single-story building. The project also includes construction of a realigned westernmost track, along the west side of the new island platform, and demolition of the existing station. The Scope of Work (SOW) shall include comprehensive construction management services for construction of a new island platform passenger station, track roadbed, a pedestrian underpass, a pedestrian bridge, structural modifications to an existing commercial building, and two (2) sets of stairs and elevators. The term of the Contract shall be thirty-seven (37) consecutive calendar months from the date set forth in the written Notice-To-Proceed (NTP).
Post-Bid
Transportation Terminals
$68,900,900.00
Public - State/Provincial
Demolition, New Construction, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 20, 2026
April 19, 2026
Crystal Dr, Arlington, VA
Related To This Project
Arlington, VA
Bid Date: Dec 12 2022
Arlington, VA
Bid Date: Sep 28 2022
Arlington, VA
Bid Date: Dec 21 2022
Arlington, VA
--
Arlington, VA
Bid Date: Sep 29 2022
Arlington, VA
--
Arlington, VA
Bid Date: Mar 14 2023
Arlington, VA
--
Arlington, VA
--
Arlington, VA
--
Arlington, VA
--
Arlington, VA
Bid Date: Dec 14 2022
Arlington, VA
Bid Date: Sep 19 2022
Arlington, VA
Bid Date: Nov 29 2022
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
